Gray Box Optimization for Mk Landscapes (NK Landscapes and MAX-kSAT)

L Darrell Whitley1, Francisco Chicano2, Brian W Goldman3

  • 1Department of Computer Science, Colorado State University, USA whitley@cs.colostate.edu.

Related Concept Videos

Methods of Medium Optimization01:28

Methods of Medium Optimization

Optimizing growth media enhances microbial proliferation and maximizes product yield. Statistical experimental design methodologies provide structured and reproducible approaches, offering progressively higher levels of robustness and efficiency.The One-Factor-at-a-Time (OFAT) MethodThe One-Factor-at-a-Time (OFAT) method involves adjusting a single variable while keeping all others constant. However, it cannot detect interactions between variables, often leading to suboptimal outcomes when...
1
Boundary Conditions: Lossless Lines01:21

Boundary Conditions: Lossless Lines

Consider a single-phase, two-wire, lossless transmission line terminated by an impedance at the receiving end and a source with Thevenin voltage and impedance at the sending end. The line, with length, has a surge impedance and wave velocity determined by the line's inductance and capacitance.
At the receiving end, the boundary condition states that the voltage equals the product of the receiving-end impedance and current. This relationship is expressed as a function of the incident and...
453
Optimization Problems01:26

Optimization Problems

Optimization problems often involve identifying maximum or minimum values under specific constraints. A well-known example is determining the longest horizontal pipe that can be moved around a right-angled corner, where a 3-meter-wide hallway meets a 2-meter-wide hallway. This scenario, common in architectural design and industrial transport, can be understood conceptually through geometric and trigonometric reasoning.To visualize the problem, consider the pipe as a straight line that touches...
129
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
508
Methods of Obtaining Topography01:25

Methods of Obtaining Topography

Topography involves measuring and mapping land elevations, natural features, and artificial structures to create accurate representations of the terrain. Topographic surveying relies on traditional and modern methods, each with distinct advantages and limitations.Traditional Surveying Methods:Transit stadia surveys and plane table surveys were widely used traditional surveying methods. These techniques relied on instruments like theodolites and stadia rods for measuring distances and angles,...
437
Reducing Line Loss01:18

Reducing Line Loss

In a three-phase circuit, line loss is an indicator of energy dissipated as heat due to the resistance of transmission lines. To address this, incorporating transformers into the system—a step-up transformer at the source and a step-down transformer at the load—is a strategic solution. Two three-phase transformers are introduced to improve this.
With a step-up transformer at the source, the voltage is increased, thereby reducing the current in the transmission lines since power loss in...
438