Optimized hydraulic retention time for phosphorus and COD removal from synthetic domestic sewage with granules in a

Dong Li1, Yufeng Lv1, Meizhong Cao1

  • 1Key Laboratory of Water Science and Water Environment Recovery Engineering, Beijing University of Technology, Beijing 100123, China.