Related Experiment Video
Updated: Mar 18, 2026

Performing Data Mining And Integrative Analysis Of Biomarker in Breast Cancer Using Multiple Publicly Accessible Databases
Published on: May 17, 2019
Meta-dimensional data integration identifies critical pathways for susceptibility, tumorigenesis and progression of
Runmin Wei1,2, Immaculata De Vivo3, Sijia Huang1,2
1Molecular Biosciences and Bioengineering Graduate Program, University of Hawaii at Manoa, Honolulu, HI, USA.
Abstract:
Endometrial Cancer (EC) is one of the most common female cancers. Genome-wide association studies (GWAS) have been investigated to identify genetic polymorphisms that are predictive of EC risks. Here we utilized a meta-dimensional integrative approach to seek genetically susceptible pathways that may be associated with tumorigenesis and progression of EC. We analyzed GWAS data obtained from Connecticut Endometrial Cancer Study (CECS) and identified the top 20 EC susceptible pathways. To further verify the significance of top 20 EC susceptible pathways, we conducted pathway-level multi-omics analyses using EC exome-Seq, RNA-Seq and survival data, all based on The Cancer Genome Atlas (TCGA) samples. We measured the overall consistent rankings of these pathways in all four data types. Some well-studied pathways, such as p53 signaling and cell cycle pathways, show consistently high rankings across different analyses. Additionally, other cell signaling pathways (e.g. IGF-1/mTOR, rac-1 and IL-5 pathway), genetic information processing pathway (e.g. homologous recombination) and metabolism pathway (e.g. sphingolipid metabolism) are also highly associated with EC risks, diagnosis and prognosis. In conclusion, the meta-dimensional integration of EC cohorts has suggested some common pathways that may be associated from predisposition, tumorigenesis to progression.
More Related Videos
09:40Author Spotlight: Unveiling the Role of TMOD3 in Platinum Resistance and Immune Infiltration in Ovarian Cancer
Published on: August 2, 2024
07:44Non-Invasive Ultrasound Assessment of Endometrial Cancer Progression in Pax8-Directed Deletion of the Tumor Suppressors Arid1a and Pten in Mice
Published on: February 17, 2023