Modelling the impact of causal and non-causal factors on disruption duration for Toronto's subway system: An
Jacob Louie1, Amer Shalaby2, Khandker Nurul Habib2
1University of Toronto, Canada.
Abstract:
Most investigations of incident-related delay duration in the transportation context are restricted to highway traffic, with little attention given to delays due to transit service disruptions. Studies of transit-based delay duration are also considerably less comprehensive than their highway counterparts with respect to examining the effects of non-causal variables on the delay duration. However, delays due to incidents in public transit service can have serious consequences on the overall urban transportation system due to the pivotal and vital role of public transit. The ability to predict the durations of various types of transit system incidents is indispensable for better management and mitigation of service disruptions. This paper presents a detailed investigation on incident delay durations in Toronto's subway system over the year 2013, focusing on the effects of the incidents' location and time, the train-type involved, and the non-adherence to proper recovery procedures. Accelerated Failure Time (AFT) hazard models are estimated to investigate the relationship between these factors and the resulting delay duration. The empirical investigation reveals that incident types that impact both safety and operations simultaneously generally have longer expected delays than incident types that impact either safety or operations alone. Incidents at interchange stations are cleared faster than incidents at non-interchange stations. Incidents during peak periods have nearly the same delay durations as off-peak incidents. The estimated models are believed to be useful tools in predicting the relative magnitude of incident delay duration for better management of subway operations.
Related Concept Videos
Hazard Rate
Power System Three-Phase Short Circuits
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Causality in Epidemiology
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Steps in Outbreak Investigation