Related Experiment Video
Updated: Mar 12, 2026

Safety Precautions and Operating Procedures in an ABSL-4 Laboratory: 3. Aerobiology
Published on: October 3, 2016
Workplace safety in Bangladesh ready-made garment sector: 3 years after the Rana Plaza collapse
Uttama Barua1, Mehedi Ahmed Ansary2
1a Department of Urban and Regional Planning , Bangladesh University of Engineering and Technology , Bangladesh.
Abstract:
Workplace safety is one of the most important issues in industries worldwide, and is endangered by industrial accidents. Different industrial disasters have resulted in several initiatives worldwide to protect human life and reduce material damage, both nationally and internationally. In Bangladesh, the ready-made garment (RMG) industry is one of the most important export-oriented business sectors, which is facing challenges to ensure workplace safety. The Rana Plaza collapse in Bangladesh is the consequence of such non-compliance. The accident resulted in different local and global initiatives to address the challenges. This article reviews progress and achievement of the initiatives to reduce vulnerability in the Bangladesh RMG industry within 3 years after the deadly accident. In the long run, the challenge is to maintain momentum already created for achieving sustainability in the RMG sector in Bangladesh and maintaining compliance even after the end of support from external partners.
More Related Videos
09:54Safety Precautions and Operating Procedures in an ABSL-4 Laboratory: 1. Biosafety Level 4 Suit Laboratory Suite Entry and Exit Procedures
Published on: October 3, 2016
05:47Simulation of a Scaled Assembly Process with Collaboration of a Robotic Arm and Monitoring through a Vision System for Quality Control
Published on: August 29, 2025
Related Concept Videos
Survey Safety
PPE Use in Healthcare Settings I: Donning
Personal Protective Equipment
Reinforced Brick Masonry
To fortify brick walls...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Preplaced Aggregate Concrete