Related Experiment Video
Updated: Mar 12, 2026

Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
Published on: February 1, 2020
A multivariate-based conflict prediction model for a Brazilian freeway
Felipe Caleffi1, Michel José Anzanello2, Helena Beatriz Bettella Cybis1
1Laboratory of Transport Systems, Federal University of Rio Grande do Sul, Porto Alegre, RS 90035-180, Brazil.
Abstract:
Real-time collision risk prediction models relying on traffic data can be useful in dynamic management systems seeking at improving traffic safety. Models have been proposed to predict crash occurrence and collision risk in order to proactively improve safety. This paper presents a multivariate-based framework for selecting variables for a conflict prediction model on the Brazilian BR-290/RS freeway. The Bhattacharyya Distance (BD) and Principal Component Analysis (PCA) are applied to a dataset comprised of variables that potentially help to explain occurrence of traffic conflicts; the parameters yielded by such multivariate techniques give rise to a variable importance index that guides variables removal for later selection. Next, the selected variables are inserted into a Linear Discriminant Analysis (LDA) model to estimate conflict occurrence. A matched control-case technique is applied using traffic data processed from surveillance cameras at a segment of a Brazilian freeway. Results indicate that the variables that significantly impacted on the model are associated to total flow, difference between standard deviation of lanes' occupancy, and the speed's coefficient of variation. The model allowed to asses a characteristic behavior of major Brazilian's freeways, by identifying the Brazilian typical heterogeneity of traffic pattern among lanes, which leads to aggressive maneuvers. Results also indicate that the developed LDA-PCA model outperforms the LDA-BD model. The LDA-PCA model yields average 76% classification accuracy, and average 87% sensitivity (which measures the rate of conflicts correctly predicted).
Related Concept Videos
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Multiple Regression
Farmers can use multiple regression to determine the crop yield based on more than one factor, such as water availability, fertilizer, soil properties, etc. Here, the crop yield is the response or dependent variable as it depends on the other independent variables. The analysis requires the construction of a scatter plot...
Correlation and Regression
Regression Analysis
In regression analysis, a regression equation is determined based on the line of best fit– a line that best fits the data points plotted in a graph. This line is also called the regression line. The algebraic equation for the regression line is called the regression equation. It is represented as:
Response Surface Methodology
The process of RSM involves several key steps:
Friedman Two-way Analysis of Variance by Ranks

