Tsunamis caused by submarine slope failures along western Great Bahama Bank

Jara S D Schnyder1, Gregor P Eberli1, James T Kirby2

  • 1CSL-Center for Carbonate Research, University of Miami, 4600 Rickenbacker Cswy., 33149 Miami, USA.

Scientific Reports
|November 5, 2016
PubMed

Related Concept Videos

Effect of Sea Water on Concrete01:22

Effect of Sea Water on Concrete

Concrete exposed to seawater can undergo degradation like the dissolution of ettringite and gypsum, increasing the material's porosity and decreasing its strength. In contrast, the crystallization of salts within the concrete's pores can cause expansion, particularly above the waterline where evaporation occurs. Nonetheless, this expansion only happens when seawater, enabled by the concrete's permeability, manages to infiltrate the structure.
Concrete in areas between tide marks,...
1.2K
Destabilization of Microtubules01:45

Destabilization of Microtubules

The destabilization of microtubules can occur during different stages of the microtubule lifecycle, such as nucleation or elongation. It can take place at either end of the microtubule or in the microtubule lattices as a whole. The lifespan of individual microtubules within a cell varies according to the cell type and stage of the cell cycle. During interphase, the lifespan of the microtubule is about 30 minutes, while during cell division, it is about 15 minutes. In axonal microtubules of...
3.8K
Microtubule Instability02:17

Microtubule Instability

Microtubules are hollow cylindrical filaments having a diameter of approximately 25 nm and a length that varies from 200 nm to 25 μm. GTP-bound tubulin subunits form αβ-heterodimers for microtubule assembly. These core building blocks interact longitudinally, polymerizing into protofilaments. The protofilaments then interact with one another through lateral bonding forces to form stable cylindrical microtubules. These cylindrical filaments are dynamic as they undergo repeated...
6.4K
Errors in Taping01:18

Errors in Taping

Errors in taping arise from multiple factors that can significantly impact measurement accuracy in surveying. Misalignment of the tape, often due to human error, is one primary source. A skilled rear tapeman, using a telescope, can help correct alignment by guiding the head tapeman; however, human limitations still lead to small inaccuracies. These errors may include misplacement of pins or inaccurate tape readings due to common visual confusions, such as mistaking a six for a nine. Such...
412
Power System Three-Phase Short Circuits01:21

Power System Three-Phase Short Circuits

Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
601
Fault Types01:18

Fault Types

When analyzing a single line-to-ground fault from phase A to ground at a three-phase bus, it is important to consider the fault impedance. This impedance is zero for a bolted fault, equal to the arc impedance for an arcing fault, and represents the total fault impedance for a transmission-line insulator flashover. To derive sequence and phase currents, fault conditions are translated from the phase domain to the sequence domain.
For line-to-line faults occurring between phases B and C, the...
474