Pacing during an ultramarathon running event in hilly terrain

Hugo A Kerhervé1, Tom Cole-Hunter2, Aaron N Wiegand3

  • 1School of Health and Sport Sciences, University of the Sunshine Coast , Sippy Downs , QLD , Australia.

Peerj
|November 5, 2016
PubMed
Abstract

Related Concept Videos

Distance Problem01:29

Distance Problem

When an object's velocity changes over time, the total distance traveled can be determined by summing small displacement intervals over short increments. This approach approximates the true distance through numerical summation and the use of integral calculus. An estimate of the total displacement can be obtained by measuring velocity at regular intervals and multiplying each value by the corresponding time step.If a runner accelerates over the first three seconds of a race, speed measurements...
127
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
435
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
417
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
490
Construction of Frequency Distribution01:15

Construction of Frequency Distribution

A frequency distribution table can be constructed using the steps given below.
First, make a table with two columns—one with the title of the data that needs to be organized, and the other column for frequency. [Draw a third column for tally marks if needed]. Then, take a look at the items given in the data set and decide if an ungrouped frequency distribution table or a grouped frequency distribution table would be more suitable. If there are large sets of different values, then it is...
13.2K
Topographic Surveying and Contours01:29

Topographic Surveying and Contours

Topographic surveying is critical for documenting the Earth's surface, focusing on capturing elevations, slopes, and natural and man-made features. It is essential in construction planning, water resource management, and land-use analysis. The primary outcome of such surveys is a topographic map, which uses contour lines to visually represent the shape and slope of the terrain, providing valuable insights into the landscape's characteristics.Contour lines are fundamental to understanding the...
1.2K