How many days are required for workers to acclimatize to heat?

Tamer Mohamed Khalaf1,2, Mohamed Zaki Ramadan1, Riyad A Al-Ashaikh3

  • 1Department of Industrial Engineering, College of Engineering, King Saud University, Riyadh, Saudi Arabia.

Work (Reading, Mass.)
|February 18, 2017
PubMed
Abstract

Related Concept Videos

Hot Weather Concreting01:20

Hot Weather Concreting

Concreting at elevated temperatures accelerates the hydration process, leading to quicker setting but potentially reducing the long-term strength of the concrete structure. Additionally, low air humidity fosters rapid moisture loss from the concrete, resulting in reduced workability, pronounced plastic shrinkage, and a higher likelihood of crazing.
Mitigating the heat increase in concrete can be economically achieved by shading aggregate stockpiles to prevent heating from solar radiation,...
340
Masonry in Cold and Hot Weather Conditions01:21

Masonry in Cold and Hot Weather Conditions

In cold weather, masonry construction requires specific precautions to ensure mortar does not freeze before curing, as this can significantly weaken its strength and watertightness. Mortar temperature should be maintained between 60°F and 80°F to support proper hydration and curing. Below 40°F, mortar water must be heated, but should not exceed 120°F as high temperatures can reduce mortar's compressive and bond strength.
Other key practices include keeping masonry units...
360
Responses to Heat and Cold Stress02:45

Responses to Heat and Cold Stress

Every organism has an optimum temperature range within which healthy growth and physiological functioning can occur. At the ends of this range, there will be a minimum and maximum temperature that interrupt biological processes.
15.5K
Accelerated Curing of Concrete01:25

Accelerated Curing of Concrete

Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
530
Decreased Body Temperature01:29

Decreased Body Temperature

A decreased body temperature can occur in patients with hypothermia and frostbite. Heat loss with extended cold exposure overpowers the body's ability to create heat, resulting in hypothermia. Core temperature readings help classify hypothermia. Mild hypothermia is temperatures between 32 °C (89.6 °F) and 35°C (95 °F) and is caused by impaired thermoregulation. Moderate hypothermia is temperatures between 28 C (82.4 °F) and 32 °C (89.6 °F) caused by...
1.1K
Mass Concreting01:22

Mass Concreting

Mass concreting refers to the process of placing large volumes of concrete, such as in gravity dams. The heat generated during the cement hydration process and differential cooling rates within the concrete mass can lead to a temperature gradient, which can result in thermal cracks in the concrete mass.
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
403