Transient Recharge Estimability Through Field-Scale Groundwater Model Calibration
Related Experiment Video
Updated: Mar 2, 2026

Measuring Carbon-based Contaminant Mineralization Using Combined CO2 Flux and Radiocarbon Analyses
Published on: October 21, 2016
Matthew J Knowling1,2,3, Adrian D Werner1,2
1National Centre for Groundwater Research and Training, Flinders University, GPO Box 2100, Adelaide, South Australia, 5001, Australia.
Abstract:
The estimation of recharge through groundwater model calibration is hampered by the nonuniqueness of recharge and aquifer parameter values. It has been shown recently that the estimability of spatially distributed recharge through calibration of steady-state models for practical situations (i.e., real-world, field-scale aquifer settings) is limited by the need for excessive amounts of hydraulic-parameter and groundwater-level data. However, the extent to which temporal recharge variability can be informed through transient model calibration, which involves larger water-level datasets, but requires the additional consideration of storage parameters, is presently unknown for practical situations. In this study, time-varying recharge estimates, inferred through calibration of a field-scale highly parameterized groundwater model, are systematically investigated subject to changes in (1) the degree to which hydraulic parameters including hydraulic conductivity (K) and specific yield (Sy ) are constrained, (2) the number of water-level calibration targets, and (3) the temporal resolution (up to monthly time steps) at which recharge is estimated. The analysis involves the use of a synthetic reality (a reference model) based on a groundwater model of Uley South Basin, South Australia. Identifiability statistics are used to evaluate the ability of recharge and hydraulic parameters to be estimated uniquely. Results show that reasonable estimates of monthly recharge (<30% recharge root-mean-squared error) require a considerable amount of transient water-level data, and that the spatial distribution of K is known. Joint estimation of recharge, Sy and K, however, precludes reasonable inference of recharge and hydraulic parameter values. We conclude that the estimation of temporal recharge variability through calibration may be impractical for real-world settings.
Related Concept Videos
Typical Model Studies
Design Example: Creating a Hydraulic Model of a Dam Spillway
Indefinite Integrals

