Related Experiment Video
Updated: Feb 28, 2026

Collecting Sleep, Circadian, Fatigue, and Performance Data in Complex Operational Environments
Published on: August 8, 2019
Modeling Change in Project Duration and Completion: Scheduling Dynamics of NASA's Exploration Flight Test 1 (EFT-1)
Travis J Wiltshire1, Jonathan E Butner2, Zachary Pirtle3
1University of Southern Denmark.
Abstract:
In complex work domains and organizations, understanding schedule-ing dynamics can ensure objectives are reached and delays are mitigated. In the current paper, we examine the scheduling dynamics for NASA's Exploration Flight Test 1 (EFT-1) activities. For this examination, we specifically modeled simultaneous change in percent complete and estimated duration for a given project as they were included in monthly reports over time. In short, we utilized latent change score mixture modeling to extract the attractor dynamics within the scheduling data. We found three primarily patterns: an attractor at low duration, low percent complete; a saddle that was attractive toward full completion and repelled duration away from five months, and an attractor at full completion and high duration. We replicated these three patterns using multilevel modeling. Then, we examined how task dependencies, in terms of the number of predecessors and successors, affected the probability of exhibiting a given pattern over time. Thus, we offer a flexible method for understanding the patterns that can characterize scheduling dynamics as well as other dynamical systems. Several recommendations for future directions are discussed.
More Related Videos
13:59Reduced-gravity Environment Hardware Demonstrations of a Prototype Miniaturized Flow Cytometer and Companion Microfluidic Mixing Technology
Published on: November 13, 2014
11:08Exploring the Effects of Spaceflight on Mouse Physiology using the Open Access NASA GeneLab Platform
Published on: January 13, 2019