Related Experiment Video
Updated: Feb 23, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Nutrient and organic matter removal from low strength sewage treated with constructed wetlands
D Mello1, K Q Carvalho2, F H Passig3
1a Environmental Sciences and Technology Graduate Program. St. Deputado Heitor de Alencar Furtado , Federal University of Technology , Curitiba , Brazil.
Abstract:
The role of Eichhornia crassipes for removing pollutants from low strength sewage was evaluated in three pilot-scale constructed wetlands (CW): CW 1, planted with E. crassipes in a filter media; CW 2, unplanted, composed by filter media; and CW 3, composed by E. crassipes floating on the sewage. The operation was divided into three stages by varying the nominal hydraulic retention time into: (I) 24 h; (II) 48 h; (III) 72 h. Temporal sampling profiles were carried out with collection of the influent and effluent samples to determine temperature, pH, chemical oxygen demand (COD), TKN and TP. Contents of TP and TN were analyzed in the plant tissue of the macrophyte. The best removal efficiency rates for phosphorus (38%) and TKN (47%) were obtained in CW 3 for 72 h. The highest COD removal was observed in the CW 2 (80%) for 48 h. The macrophyte E. crassipes contributed to the absorption process with uptake rate percentages of 8.3% (CW 1) and 9.0% (CW 3) for TN and 0.78% (CW 1) and 1.56% (CW 3) for TP on the dry matter of the plant. The chosen species planted in the systems contributed to the achievement of higher nutrient removal.
More Related Videos
08:49Vegetated Treatment Systems for Removing Contaminants Associated with Surface Water Toxicity in Agriculture and Urban Runoff
Published on: May 15, 2017
08:09Wastewater Irrigation Impacts on Soil Hydraulic Conductivity: Coupled Field Sampling and Laboratory Determination of Saturated Hydraulic Conductivity
Published on: August 19, 2018
Related Concept Videos
Bioremediation
Coagulation
Environmental Applications of Microorganisms