Related Experiment Video
Updated: Feb 21, 2026

13:48
Design and Construction of an Urban Runoff Research Facility
Published on: August 8, 2014
13.6K
The Essentials of Bore-Hole Latrine Construction
1D.S.O., From the Helminthological Research Laboratory School of Tropical Medicine, Calcutta, Endowment Fund.
The Indian Medical Gazette
|October 11, 2017
Summary
No abstract available in PubMed .
More Related Videos
Related Concept Videos
Design Example: Maintaining Level of an Embankment
463
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
463
Laying Concrete Masonry
424
Constructing a concrete masonry wall involves a series of steps designed to ensure durability, stability, and alignment. The construction starts with preparing the base, which includes cleaning the area where the wall will be erected. The next step involves spreading mortar where the first row of concrete blocks will be laid, typically starting at a corner section to help define the wall's boundaries.
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
424
Placing Concrete
537
The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
537
Testing Water Quality
405
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
405
Handwashing I: Introduction and Types of Equipment
5.1K
Handwashing is hand hygiene with plain or antimicrobial soap and water to physically remove dirt, organic material, and microorganisms. However, it may not kill all microorganisms. The handwashing procedure requires a hand wash basin, liquid soap, paper towels, a domestic waste bin, and disposable nail cleaner as optional equipment.
Hand wash basins in clinical areas should have faucets that can be turned on and off without using the hands; that is, they should be non-touch or lever-operated....
Hand wash basins in clinical areas should have faucets that can be turned on and off without using the hands; that is, they should be non-touch or lever-operated....
5.1K
Design Example: Managing Concrete Workability
317
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
317

