A user-centred design process of new cold-protective clothing for offshore petroleum workers operating in the Barents

Ole Petter Naesgaard1, Tore Christian Bjørsvik Storholmen1, Øystein Nordrum Wiggen1

  • 1SINTEF Technology and Society, Department of Health Research, Norway.

Industrial Health
|October 20, 2017
PubMed

Related Concept Videos

Personal Protective Equipment01:20

Personal Protective Equipment

Personal protective equipment (PPE) is unique clothing or equipment worn by an employee to minimize or prevent exposure to infectious agents. PPE creates a barrier between the employee and the infectious materials. PPE must be readily available in the patient care area. PPE includes gloves, gowns and aprons, masks and respirators, goggles, face shields, shoes, and headcovers:
2.4K
PPE Use in Healthcare Settings II: Doffing01:10

PPE Use in Healthcare Settings II: Doffing

The sequence of removing or doffing PPE starts with the gloves, as they are the most contaminated. Next is removal of the face shield or goggles, as they would interfere with removing other PPE. Then remove the gown, followed by the mask or respirator. Perform hand hygiene between steps if hands become contaminated and immediately after removing all PPE. Generally, the outside front and sleeves of the isolation gown, the goggles or the mask, the respirator, and the face shield are contaminated.
1.7K
PPE Use in Healthcare Settings I: Donning01:22

PPE Use in Healthcare Settings I: Donning

Donning PPE must be completed before contact with the patient. This process protects from infectious agents. The sequence and action included in each donning are critical, and the steps must be systematic to avoid exposure to pathogens. The institutional policy also needs to be followed while donning PPE. The pre-donning preparations are gathering equipment, inspecting the PPE equipment for tears, holes, or damage, removing jewelry, removing any garments below the elbows, and tying the hair...
1.8K
Masonry in Cold and Hot Weather Conditions01:21

Masonry in Cold and Hot Weather Conditions

In cold weather, masonry construction requires specific precautions to ensure mortar does not freeze before curing, as this can significantly weaken its strength and watertightness. Mortar temperature should be maintained between 60°F and 80°F to support proper hydration and curing. Below 40°F, mortar water must be heated, but should not exceed 120°F as high temperatures can reduce mortar's compressive and bond strength.
Other key practices include keeping masonry units...
353
Cold Weather Concreting01:27

Cold Weather Concreting

When freshly poured concrete is exposed to freezing temperatures before it has set, the water within the concrete can freeze. This expansion disrupts the setting process, delays chemical reactions necessary for hardening, and increases the volume of pores within the hardened concrete, which weakens its overall structure. If the concrete manages to reach an appreciable strength before it freezes, the damage can be somewhat mitigated.
To counteract the negative impacts of cold weather, ensuring...
401
Responses to Heat and Cold Stress02:45

Responses to Heat and Cold Stress

Every organism has an optimum temperature range within which healthy growth and physiological functioning can occur. At the ends of this range, there will be a minimum and maximum temperature that interrupt biological processes.
15.0K