Overcoming mutational complexity in acute myeloid leukemia by inhibition of critical pathways

Yoriko Saito1, Yoshiki Mochizuki2, Ikuko Ogahara1

  • 1Laboratory for Human Disease Models, RIKEN Center for Integrative Medical Sciences, Yokohama, Kanagawa 230-0045, Japan.

Related Concept Videos

Combination Therapies and Personalized Medicine02:50

Combination Therapies and Personalized Medicine

Combining two or more treatment methods increases the life span of cancer patients while reducing damage to vital organs or tissue from the overuse of a single treatment. Combination therapy also targets different cancer-inducing pathways, thus reducing the chances of developing resistance to treatment.
The combination of the drug acetazolamide and sulforaphane is a good example of combination therapy to treat cancer. The cells in the interior of a large tumor often die due to the hypoxic and...
6.2K
Targeted Cancer Therapies02:57

Targeted Cancer Therapies

The targeted cancer therapies, also known as “molecular targeted therapies,” take advantage of the molecular and genetic differences between the cancer cells and the normal cells. It needs a thorough understanding of the cancer cells to develop drugs that can target specific molecular aspects that drive the growth, progression, and spread of cancer cells without affecting the growth and survival of other normal cells in the body.
There are several types of targeted therapies against...
9.0K
Treatment Resistant Cancers02:56

Treatment Resistant Cancers

Cancer is the second leading cause of death in the United States. A cancer cell is genetically unstable and hence can mutate faster. They can also modify their microenvironment and escape immune surveillance. The difficulties in treating cancer are further compounded by the emergence of rapid resistance to anticancer drugs. The most common ways to attain resistance in cancer cells include alteration in drug transport and metabolism, modification of drug target, elevated DNA damage response, or...
3.8K
The Intrinsic Apoptotic Pathway01:31

The Intrinsic Apoptotic Pathway

Internal cellular stress, such as cellular injury or hypoxia, triggers intrinsic apoptosis. The B-cell lymphoma 2 (Bcl-2) family of proteins are the primary regulators of the intrinsic apoptotic pathway. For example, during DNA damage, checkpoint proteins, such as Ataxia Telangiectasia Mutated (ATM protein) and Checkpoints Factor-2 (Chk2) proteins, are activated. These proteins phosphorylate p53 which further activates pro-apoptotic proteins, such as Bax, Bak, PUMA, and Noxa, and inhibits...
8.8K
Adaptive Mechanisms in Cancer Cells02:53

Adaptive Mechanisms in Cancer Cells

Cancer cells accumulate genetic changes at an abnormally rapid rate due to the defects in the DNA repair mechanisms. From an evolutionary perspective, such genetic instability is advantageous for cancer development. Mutant cell lines accumulate a series of beneficial mutations that contribute to their progression into cancer.
Some of the advantages that cancer cells have on normal cells include - enhanced ability to divide without terminally differentiating, induce new blood vessel formation,...
7.2K
Inhibition of Cdk Activity02:34

Inhibition of Cdk Activity

The orderly progression of the cell cycle depends on the activation of Cdk protein by binding to its cyclin partner. However, the cell cycle must be restricted when undergoing abnormal changes. Most cancers correlate to the deregulated cell cycle, and since Cdks are a central component of the cell cycle, Cdk inhibitors are extensively studied to develop anticancer agents. For instance, cyclin D associates with several Cdks, such as Cdk 4/6, to form an active complex. The cyclin D-Cdk4/6 complex...
6.1K