A novel framework to evaluate pedestrian safety at non-signalized locations

Ting Fu1, Luis Miranda-Moreno1, Nicolas Saunier2

  • 1Department of Civil Engineering and Applied Mechanics, McGill University, Room 268, Macdonald Engineering Building, 817 Sherbrooke Street West, Montréal, Québec H3A 0C3, Canada.

Related Concept Videos

Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
425
Design Example: Joints in Concrete Pavements01:28

Design Example: Joints in Concrete Pavements

Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
562
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
434
Design Example: Calculating Safe Diameter for Wind-Exposed Disc01:17

Design Example: Calculating Safe Diameter for Wind-Exposed Disc

Assessing safety in wind-exposed installations is crucial to preventing potential failures. This example explores the calculation and design adjustments needed to mount a circular disc on a building facade, where wind forces are a primary concern. A 4-meter diameter disc was initially designed as an aesthetic feature facing winds at a velocity of 25 meters per second, with an air density of 1.25 kilograms per cubic meter. Given these conditions, the drag force on the disc was determined using...
365
Pre-Procedural Guidelines for Assessing Blood Pressure01:10

Pre-Procedural Guidelines for Assessing Blood Pressure

Accurate blood pressure assessment is crucial for diagnosing and managing various health conditions. To ensure the reliability of these measurements, healthcare professionals must adhere to standardized pre-procedural guidelines. These guidelines enhance patient safety and improve the overall quality of healthcare. The following steps are essential for obtaining accurate and consistent blood pressure readings, from using the appropriate tools to ensuring effective communication with the...
901
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
359