Protein A chromatography resin lifetime-impact of feed composition
Related Experiment Video
Updated: Feb 15, 2026

Detection and Removal of Tooth-Colored Composite Resin Using the Fluorescence-Aided Identification Technique
Published on: July 27, 2022
Mili Pathak1, Anurag S Rathore1, Katherine Lintern2
1Department of Chemical Engineering, Indian Institute of Technology, New Delhi, India.
Abstract:
Adsorbent lifetime during protein A chromatography is not readily predicted or understood, representing a key challenge to be addressed for biopharmaceutical manufacturers. This article focuses on the impact of feed composition on the performance of a typical agarose-based protein A resin across a lifetime of 50 cycles. Cycling studies were performed using three different feed materials with varying levels of feed components including proteases, histones, DNA, and nonhistone proteins. Changes in the process and quality attributes were measured. The DBCs were not seen to vary between conditions although there was a reduction in particle porosity in all cases. Fluorescence spectroscopy and LC-MS/MS were used to identify the contribution and extent of fouling to the observed capacity loss. Residual protein A ligand density and deposition of foulants (HCP, residual mAb, and DNA) varied between the three feed materials. Resins cycled in feed materials containing high concentrations of HCP and histones were seen to have greater extents of capacity loss. The mode of performance loss, capacity loss, or impact on product quality was seen to vary depending on the feed material. The results indicate that feed material composition may be correlated to the rate and mode of resin aging as a basis for improved process understanding. © 2018 American Institute of Chemical Engineers Biotechnol. Prog., 34:412-419, 2018.
Related Concept Videos
Classifying Matter by Composition
According to its composition, the matter can be classified into two broad categories — pure substances and mixtures.
A pure substance is a form of matter that has a constant composition throughout with uniform properties. For example, any sample of sucrose has the same composition and same physical properties, such as melting point, color, and sweetness, regardless of the source from which it is isolated.
A mixture is composed of two or...
Impact of Groups on Groups
Impact
When particles with different initial velocities collide, they induce deformation by applying equal and opposite impulses. At the point of maximum deformation, the particles move together with...
Composite Bodies
Composite bodies have widespread applications in mechanical engineering, from automobiles to aircraft to rockets. For example, an automobile wheel comprises...
Composition of Blood
Formed elements constitute the remaining 45% of the blood volume. These...
Impact of Groups on Individuals

