An anaerobic-aerobic sequential batch process with simultaneous methanogenesis and short-cut denitrification for the
1Faculty of Science and Engineering, Soka University, Tangi-machi, Hachioji, Tokyo 192-8577, Japan.
Abstract:
Although combination of denitritation and methanogenesis for wastewater treatment has been widely investigated, an application of this technology to solid waste treatment has been rarely studied. This study investigated an anaerobic-aerobic batch system with simultaneous denitritation-methanogenesis as an effective treatment for marine biofoulings, which is a major source of intermittently discharged organic solid wastes. Preliminary NO2--exposed sludge was inoculated to achieve stable methanogenesis process without NO2- inhibition. Both high NH4+-N removal of 99.5% and high NO2--N accumulation of 96.4% were achieved on average during the nitritation step. Sufficient CH4 recovery of 101 L-CH4 kg-COD-1 was achieved, indicating that the use of NO2--exposed sludge is effective to avoid NO2- inhibition on methanogenesis. Methanogenesis was the main COD utilization pathway when the substrate solubilization occurred actively, while denitritation was the main when solubilization was limited because of substrate shortage. The results showed a high COD removal efficiency of 96.0% and a relatively low nitrogen removal efficiency of 64.4%. Fitting equations were developed to optimize the effluent exchange ratio. The estimated results showed that the increase of effluent exchange ratio during the active solubilization period increased the nitrogen removal efficiency but decreased CH4 content in biogas. An appropriate effluent exchange ratio with high anaerobic effluent quality below approximately 120 mg-N L-1 as well as sufficient CH4 gas quality which can be used as fuel for gas engine generator was achieved by daily effluent exchange of 80% during the first week and 5% during the subsequent 8 days.
More Related Videos
Related Concept Videos
Cut-off Frequency of BJT
Alpha Cut-Off Frequency: Pertinent to the common-base configuration, the alpha cut-off frequency defines the upper-frequency limit at which the current gain, alpha, remains stable. As...
Brick Cutting Techniques
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
Short-distance Transport of Resources
Power System Three-Phase Short Circuits
Three-Phase Short Circuit—Unloaded Synchronous Machine
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
pre-mRNA Processing
Once about 20-40 ribonucleotides have been joined together by RNA polymerase, a group of enzymes adds a “cap” to the 5’ end of the growing transcript. In this process, a 5’ phosphate is replaced by modified guanosine that has a methyl group attached to it (7-Methyl...