Key Design Considerations When Calculating Cost Savings for Population Health Management Programs in an Observational

Shannon M E Murphy1, Douglas E Hough2, Martha L Sylvia3

  • 1Johns Hopkins HealthCare LLC, Glen Burnie, MD.

Health Services Research
|February 9, 2018
PubMed
Abstract

Related Concept Videos

Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
588
Transmission Line Design Considerations01:23

Transmission Line Design Considerations

Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
637
Design Example: Setting a Curve Using Design Data01:09

Design Example: Setting a Curve Using Design Data

Designing and plotting a curve using field data requires precise calculations and execution. A horizontal curve with a radius of 200 meters and an intersection angle of 20 degrees is established using the method of perpendicular offsets from the long chord. The long chord, which spans between the curve's endpoints, is calculated to be 69.46 meters in length. To maintain accuracy in plotting, intervals of 3 meters are selected along the chord.The engineer determines the offset distances for each...
252
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
317
Conservation of Small Populations02:04

Conservation of Small Populations

Small population sizes put a species at extreme risk of extinction due to a lack of variation, and a consequent decrease in adaptability. This weakens the chances of survival under pressures such as climate change, competition from other species, or new diseases. Large populations are more likely to survive pressures such as these, as such populations are more likely to harbor individuals that have genetic variants that are adaptive under new stresses. Small populations are much less...
17.5K
Design Example: Calculating Safe Diameter for Wind-Exposed Disc01:17

Design Example: Calculating Safe Diameter for Wind-Exposed Disc

Assessing safety in wind-exposed installations is crucial to preventing potential failures. This example explores the calculation and design adjustments needed to mount a circular disc on a building facade, where wind forces are a primary concern. A 4-meter diameter disc was initially designed as an aesthetic feature facing winds at a velocity of 25 meters per second, with an air density of 1.25 kilograms per cubic meter. Given these conditions, the drag force on the disc was determined using...
365