Related Experiment Video
Updated: Feb 14, 2026

Extracellular Glucose Depletion as an Indirect Measure of Glucose Uptake in Cells and Tissues Ex Vivo
Published on: April 6, 2022
Glucose effectiveness is a critical pathogenic factor leading to glucose intolerance and type 2 diabetes: An ignored
F P Alford1,2, J E Henriksen3, C Rantzau2
1Departments of Endocrinology and Diabetes and Medicine, St Vincent's Hospital, Fitzroy, Victoria, Australia.
Background:
Although the ability of glucose to mediate its own in vivo metabolism is long documented, the quantitative measurement of whole body glucose-mediated glucose disposal at basal insulin levels (glucose effectiveness [GE]), followed the introduction of the Minimal Model intravenous glucose tolerance test technique.
Methods:
A literature review, combined with our own studies, of the role of GE in glucose metabolism in normal and "at risk" individuals, was undertaken to determine GE's contribution to glucose homeostasis.
Results:
GE accounts for ~45% to 65% of glucose disposal in man. A negative association between GE and insulin meditated glucose disposal (Si), is present in normal subjects without a family history of type 2 diabetes mellitus but is absent in normoglycaemic "at risk" relatives with a positive family history of diabetes mellitus. Intracellular GE disposal is mediated by mass action of glucose through the skeletal muscle membrane via facilitated Glut 4 transporters. However, GE is frequently forgotten as a significant contributor to the development of glucose intolerance in "at risk" individuals. Only limited studies have examined the role of a lower GE in such normoglycemic subjects with preexisting mild insulin resistance and β-cell dysfunction. These studies demonstrate that in "at risk" individuals, an initial low GE is a key contributor and predictor of future glucose intolerance, whereas an initial raised GE is protective against future glucose intolerance.
Conclusion:
In "at risk" individuals, a low GE and genetically determined vulnerable β-cell function are more critical determinants of future glucose intolerance than their preexisting insulin-resistant state.
More Related Videos
08:32Studying the Hypothalamic Insulin Signal to Peripheral Glucose Intolerance with a Continuous Drug Infusion System into the Mouse Brain
Published on: January 4, 2018
06:59Characterization of Metabolic Status in Nonhuman Primates with the Intravenous Glucose Tolerance Test
Published on: November 13, 2016
Related Concept Videos
Glucose Homeostasis: Regulation of Blood Glucose
During fasting, when blood glucose levels are low, the pancreas secretes glucagon. it...
Glucose Transporters
Facilitated diffusion-glucose transporters (GLUTs) are encoded by the solute-linked carrier (SLC) family 2, subfamily A gene family, or SLC2A. The 14 GLUT protein members are distributed into three classes:
Diabetes Mellitus: Type 2 and Gestational
Glucose Absorption Into the Small Intestine
Types of Hypothesis Testing
When the null and alternative hypotheses are stated, it is observed that the null hypothesis is a neutral statement against which the alternative hypothesis is tested. The alternative hypothesis is a claim that instead has a certain direction. If the null hypothesis claims that p = 0.5, the alternative hypothesis would be an opposing statement to this and can be put either p > 0.5, p < 0.5, or p...
Hormones Regulating Blood Glucose
In addition to accelerating glucose uptake and utilization, insulin has...