Glucose effectiveness is a critical pathogenic factor leading to glucose intolerance and type 2 diabetes: An ignored

F P Alford1,2, J E Henriksen3, C Rantzau2

  • 1Departments of Endocrinology and Diabetes and Medicine, St Vincent's Hospital, Fitzroy, Victoria, Australia.

Abstract

Related Concept Videos

Glucose Homeostasis: Regulation of Blood Glucose01:02

Glucose Homeostasis: Regulation of Blood Glucose

Carbohydrates consumed through foods are converted into glucose, a crucial energy source for the body. In the prandial state, high blood glucose levels stimulate the secretion of insulin from the pancreas. Insulin inhibits hepatic glucose production and stimulates glucose uptake and metabolism by muscle and adipose tissue. The excess glucose is converted into glycogen and stored in the liver and muscles.
During fasting, when blood glucose levels are low, the pancreas secretes glucagon. it...
4.5K
Glucose Transporters01:27

Glucose Transporters

Glucose transporters facilitate the transport of glucose across the cell membrane. In addition to glucose, some glucose transporters can also aid the movement of other hexoses such as fructose, mannose, and galactose.
Facilitated diffusion-glucose transporters (GLUTs) are encoded by the solute-linked carrier (SLC) family 2, subfamily A gene family, or SLC2A. The 14 GLUT protein members are distributed into three classes:
27.6K
Diabetes Mellitus: Type 2 and Gestational01:22

Diabetes Mellitus: Type 2 and Gestational

Type 2 diabetes, characterized by insulin resistance, arises when the insulin receptors on cells lose responsiveness to insulin, diminishing the cell's capacity to take up glucose, resulting in elevated blood glucose levels. To receive a diagnosis of Type 2 diabetes, a series of blood glucose tests are necessary to assess whether the blood glucose falls within normal parameters. If the result is out of the normal range, a patient may be diagnosed as prediabetic or diabetic, depending on the...
5.1K
Glucose Absorption Into the Small Intestine01:26

Glucose Absorption Into the Small Intestine

Complex carbohydrates consumed cannot be absorbed into the small intestine in their original form. First, they must be hydrolyzed to a monosaccharide form such as glucose or galactose. These monosaccharides are then transported across the intestinal membrane and into the blood via transcellular transport. The intestinal epithelial cells allow the movement of these monosaccharides with a defined 'entry' through membrane transporter proteins present on their apical membrane and...
36.1K
Types of Hypothesis Testing01:11

Types of Hypothesis Testing

There are three types of hypothesis tests: right-tailed, left-tailed, and two-tailed.
When the null and alternative hypotheses are stated, it is observed that the null hypothesis is a neutral statement against which the alternative hypothesis is tested. The alternative hypothesis is a claim that instead has a certain direction. If the null hypothesis claims that p = 0.5, the alternative hypothesis would be an opposing statement to this and can be put either p > 0.5, p < 0.5, or p...
28.1K
Hormones Regulating Blood Glucose01:16

Hormones Regulating Blood Glucose

Insulin is released by beta cells of the pancreas when blood glucose levels are high. It facilitates glucose absorption and utilization in insulin-dependent cells with insulin receptors on their plasma membranes. Insulin promotes glucose uptake by increasing the number of glucose transport proteins in the cell membrane, allowing glucose to enter the cell. As a result, glucose utilization and ATP production are enhanced.
In addition to accelerating glucose uptake and utilization, insulin has...
7.1K