Organizational Alignment to Promote Leadership Development for Career Readiness in College Settings

Imants Jaunarajs1, Eileen McGarry2

  • 1Ohio University.

Related Concept Videos

Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
378
The Eukaryotic Promoter Region02:40

The Eukaryotic Promoter Region

The eukaryotic promoter region is a segment of DNA located upstream of a gene. It contains an RNA polymerase binding site, a transcription start site, and several cis-regulatory sequences.  The proximal promoter region is located in the vicinity of the gene and has cis-regulatory sequences and the core promoter. The core promoter is the binding site for RNA polymerase and is usually located between -35 and +35 nucleotides from the transcription start site. The distal promoter regions are...
19.0K
The Eukaryotic Promoter Region02:40

The Eukaryotic Promoter Region

4.0K
Levels of Communication II: Organizational, Public, and Group Dynamics01:27

Levels of Communication II: Organizational, Public, and Group Dynamics

Effective communication is the foundation of a good organization. Communication is the lifeblood of an organization that connects the group with messages. In an organization, communication occurs in upward, downward, and horizontal lines. Downward communication travels from the administrative and senior levels to the staff through official channels such as manuals, rules and regulations, and organizational charts. Staff members initiate upward communication, which is addressed to executives and...
3.1K
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
358
Setting Time of Cement01:12

Setting Time of Cement

The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
739