Related Experiment Video
Updated: Feb 14, 2026

Assessment and Evaluation of the High Risk Neonate: The NICU Network Neurobehavioral Scale
Published on: August 25, 2014
Risk assessment for ballast water management - Learning from the Adriatic Sea case study
Matej David1, Stephan Gollasch2
1Dr. Matej David Consult, Korte 13e, 6310 Izola, Slovenia.
Abstract:
The ballast water management convention incorporates principles of risk assessment. A new ballast water management risk assessment model was developed to support the implementation of most efficient management measures, which we also present as a flowchart decision support system model. The risk assessment model was tested using data from port baseline surveys where available, and real shipping and ballast water discharges data. The here presented ballast water management risk assessment and possible management options are applicable elsewhere to support and improve complex decision making in the implementation of management requirements according to the ballast water management convention. If needed, the model may easy be adapted to address local specifics in any other region or area.
Related Concept Videos
Effect of Sea Water on Concrete
Concrete in areas between tide marks,...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Mitral Valve Prolapse II: Assessment and Management
Appendicitis-II: Diagnostic Studies and Management
Diagnosing Appendicitis
It requires a multifaceted approach, starting with a detailed physical examination to pinpoint the location and nature of the pain and identify any associated symptoms. Laboratory tests play a crucial role. A complete Blood Count (CBC) typically reveals leukocytosis (an increased number of...
Acute Pyelonephritis II: Diagnostic Studies and Management
Relative Risk

