Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Experiment Videos

Townsville project's key lesson outlined.

Michael Ward

    Health Estate
    |March 6, 2018
    PubMed
    Summary
    This summary is machine-generated.

    This article details a complex hospital redevelopment project involving significant power supply and building engineering services reconfiguration at Townsville Hospital. The ongoing project highlights critical infrastructure upgrades for healthcare facilities.

    Related Concept Videos

    You might also read

    Related Articles

    Articles linked to this work by shared authors, journal, and citation graph.

    Sort by
    Same author

    A class of deep intronic <i>IGHMBP2</i> variants activate a shared cryptic splice donor, enabling correction of select variants with a single antisense oligonucleotide.

    medRxiv : the preprint server for health sciences·2026
    Same author

    Applying User-Centered Design to Develop a Prescriber Feedback Tool in Acute Outpatient Care Settings at the Veterans Health Administration.

    Applied clinical informatics·2026
    Same author

    The complete genome of the KOLF2.1J reference iPSC line.

    bioRxiv : the preprint server for biology·2026
    Same author

    Statins and genetic inhibition of the mevalonate pathway activate an ATF3-STMN2 regenerative program.

    bioRxiv : the preprint server for biology·2026
    Same author

    The Windy City Rookery: Movement and Activity Patterns of Black-Crowned Night Herons (<i>Nycticorax nycticorax</i>) in a Human-Dominated Landscape.

    Ecology and evolution·2026
    Same author

    Depressive status modulates hippocampal-cortical dynamics during acute nicotine use.

    bioRxiv : the preprint server for biology·2026
    Same journal

    Ensuring the health of hospital boilers.

    Health estate·2018
    Same journal

    Solar PV - a bright future forecast.

    Health estate·2018
    Same journal

    Removing the stigma, changing perceptions.

    Health estate·2018
    Same journal

    Designing a tap to meet multiple criteria.

    Health estate·2018
    Same journal

    Getting the sensory aspects right.

    Health estate·2018
    Same journal

    Challenges set by the ErP Directive addressed.

    Health estate·2018
    See all related articles

    Area of Science:

    • Healthcare Engineering
    • Hospital Infrastructure Management
    • Building Services Engineering

    Background:

    • Townsville Hospital and Health Service undertook a complex redevelopment project.
    • The project aimed to address critical infrastructure needs within the hospital.
    • This involved upgrading essential building engineering services.

    Purpose of the Study:

    • To describe the significant reconfiguration of power supply and building engineering services.
    • To provide insights into managing complex infrastructure projects in a healthcare setting.
    • To document the ongoing redevelopment at Townsville Hospital.

    Main Methods:

    • Detailed planning and execution of power supply system upgrades.
    • Reconfiguration of various building engineering services.

    Related Experiment Videos

  • Project management of a large-scale hospital infrastructure redevelopment.
  • Main Results:

    • A complex and ongoing reconfiguration of the hospital's power supply was achieved.
    • Building engineering services underwent significant upgrades.
    • The project demonstrates a comprehensive approach to hospital infrastructure modernization.

    Conclusions:

    • The redevelopment project at Townsville Hospital necessitated substantial changes to power and engineering systems.
    • Effective management of complex engineering services is crucial for hospital functionality.
    • Ongoing infrastructure projects are vital for maintaining and improving healthcare facilities.