Eighteen Month Interval Growth of Terminal Ileal Primary Adenocarcinoma: A Consideration for Current Screening

Matthew Nazari1, Alice Lee1, Jared Rosenblum2

  • 1MedStar Georgetown University Hospital, Washingon, District of Columbia, USA.

Related Concept Videos

Primary and Secondary Growth in Roots and Shoots03:02

Primary and Secondary Growth in Roots and Shoots

Vascular plants, which account for over 90% of the Earth’s vegetation, all undergo primary growth—which lengthens roots and shoots. Many land plants, notably woody plants, also undergo secondary growth—which thickens roots and shoots.
60.7K
Current Growth And Decay In RL Circuits01:30

Current Growth And Decay In RL Circuits

The current growth and decay in RL circuits can be understood by considering a series RL circuit consisting of a resistor, an inductor, a constant source of emf, and two switches. When the first switch is closed, the circuit is equivalent to a single-loop circuit consisting of a resistor and an inductor connected to a source of emf. In this case, the source of emf produces a current in the circuit. If there were no self-inductance in the circuit, the current would rise immediately to a steady...
4.7K
Termination of Translation01:44

Termination of Translation

The large ribosomal subunit has several important structures essential to translation. These include the peptidyl transferase center (PTC) - which is the site where the peptide bond is formed - and a large, internal, water-filled tube through which the nascent polypeptide moves. This latter structure is called the Peptide Exit Tunnel, and it begins at the PTC and spans the body of the large ribosomal subunit. During translation, as the nascent polypeptide chain is synthesized, it passes through...
27.9K
Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
3.4K
Confidence Intervals01:21

Confidence Intervals

An unbiased point estimate is often insufficient to predict a population estimate, such as population mean or population proportion. In this scenario, a confidence interval is used. A confidence interval is an estimate similar to a  sample proportion. However, unlike the point estimate which is a single value, the confidence interval  contains a range of values. These values have lower and upper limits, known as confidence limits, and can be designated as L1 and L2, respectively.
A...
10.8K
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
586