Related Experiment Video
Updated: Feb 12, 2026

Mobile Game-based Virtual Reality Program for Upper Extremity Stroke Rehabilitation
Published on: March 8, 2018
Effect of Time Elapsed since Last Pruner Maintenance on Upper-Extremity Biomechanics during Manual Flower Cutting
Shyrle Berrio1, Lope H Barrero1
1a Department of Industrial Engineering, School of Engineering , Pontificia Universidad Javeriana , Bogotá , Colombia.
Objective:
Manual flower cutting imposes large biomechanical demands on workers' upper extremities. Solutions are required to reduce these demands. This study investigated the effect of time elapsed since the last pruner maintenance on the biomechanical demands of the upper extremities during flower-cutting operations.
Methods:
Sixteen experienced workers were recruited. All workers performed flower cutting 1, 15, and 30 days after standard pruner maintenance, including cleaning, adjustment, and sharpening. The outcomes included kinematics of the wrist, elbow, and forearm; muscular activity of the extensor carpi radialis, extensor carpi ulnaris, flexor carpi radialis, flexor carpi ulnaris, biceps and medium deltoids of the dominant arm; and self-reported effort.
Results:
On average across muscles, a 15-day delay (from 1 to 15 and from 15 to 30 days) in the execution of pruner maintenance increased over 8% the median recorded muscular activity as measured by the percentage of the maximum voluntary contraction of the root mean square signal. An increase in time since last pruner maintenance resulted in an increase in the 90th percentile pronation-supination posture (larger excursion toward pronation); the median and the 90th percentile velocity of the wrist and elbow; and the 90th percentile acceleration in the pronation-supination direction. There was an increase in perceived effort as measured by a Borg scale as time since last maintenance increased from 1 to 15 days.
Conclusion:
Increasing the frequency of pruner maintenance procedures can effectively reduce workers' mechanical exposures during manual flower-cutting operations. Companies should implement daily maintenance programs considering their implementation capacity and expected benefits.
Related Concept Videos
Pollination and Flower Structure
Absolute and Local Extreme Values
Maintenance of the ES Cell State
Arteries of the Upper Limbs
Cut-off Frequency of BJT
Alpha Cut-Off Frequency: Pertinent to the common-base configuration, the alpha cut-off frequency defines the upper-frequency limit at which the current gain, alpha, remains stable. As...
Brick Cutting Techniques
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...

