Time-varying mixed logit model for vehicle merging behavior in work zone merging areas

Jinxian Weng1, Gang Du2, Dan Li1

  • 1College of Transport and Communications, Shanghai Maritime University, Shanghai, 201306, China.

Related Concept Videos

Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
486
Hybrid Zones02:29

Hybrid Zones

Hybrid zones are narrow regions where two closely related species interact, mate, and produce hybrids. Relative to either parent species, hybrids may possess distinct phenotypic or genetic differences that impact their survival and reproductive success. The genetic variances introduced by hybridization influence species diversity and speciation processes within the hybrid zone.
22.0K
Timing and Consequences on Behavior01:08

Timing and Consequences on Behavior

In operant conditioning, the timing of reinforcement is crucial. For animals like rats and cats, immediate reinforcement (within a few seconds) is much more effective than delayed reinforcement. For example, a food reward for a rat needs to follow within 30 seconds of pressing a bar to be effective. 
Humans, however, can respond to delayed reinforcers. We often make decisions between immediate small rewards and delayed larger rewards. This ability to delay gratification is a significant...
419
Zones of Protection01:16

Zones of Protection

In power systems, the entire setup is divided into protective zones to isolate faults and protect the rest of the network. These zones include generators, transformers, buses, transmission lines, distribution lines, and motors. Each zone can be visualized as a separate room in a house, with each room protected by its own circuit breaker.
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
812
Gradually Varying Flow01:29

Gradually Varying Flow

Gradually varying flow (GVF) in open channels describes situations where water depth changes slowly along the channel due to factors like non-uniform bed slope, channel shape variations, or obstructions. This flow type occurs when the depth adjusts gradually to balance gravitational forces, shear forces, and energy requirements, resulting in a low rate of depth change.Characteristics of Gradually Varying FlowGVF is commonly observed in natural streams, rivers, and canals, where flow depth...
451
Rapidly Varying Flow01:24

Rapidly Varying Flow

Rapidly varying flow (RVF) in open channels is characterized by abrupt changes in flow depth over a short distance, with the rate of depth change relative to distance often approaching unity. These flows are inherently complex due to their transient and multi-dimensional nature, making exact analysis difficult. However, approximate solutions using simplified models provide valuable insights into their behavior.Key Features of Rapidly Varying FlowRVF is commonly observed in scenarios involving...
512