Interacting effects of predation risk and resource level on escape speed of amphibian larvae along a latitudinal

Beatrice Lindgren1, Germán Orizaola1, Anssi Laurila1

  • 1Animal Ecology, Department of Ecology and Genetics, Uppsala University, Uppsala, Sweden.

Related Concept Videos

Predator-Prey Interactions02:39

Predator-Prey Interactions

Predators consume prey for energy. Predators that acquire prey and prey that avoid predation both increase their chances of survival and reproduction (i.e., fitness). Routine predator-prey interactions elicit mutual adaptations that improve predator offenses, such as claws, teeth, and speed, as well as prey defenses, including crypsis, aposematism, and mimicry. Thus, predator-prey interactions resemble an evolutionary arms race.
21.7K
What is an Electrochemical Gradient?01:26

What is an Electrochemical Gradient?

Adenosine triphosphate, or ATP, is considered the primary energy source in cells. However, energy can also be stored in the electrochemical gradient of an ion across the plasma membrane, which is determined by two factors: its chemical and electrical gradients.
The chemical gradient relies on differences in the abundance of a substance on the outside versus the inside of a cell and flows from areas of high to low ion concentration. In contrast, the electrical gradient revolves around an...
128.4K
Short-distance Transport of Resources02:12

Short-distance Transport of Resources

Short-distance transport refers to transport that occurs over a distance of just 2-3 cells, crossing the plasma membrane in the process. Small uncharged molecules, such as oxygen, carbon dioxide, and water, can diffuse across the plasma membrane on their own. In contrast, ions and larger molecules require the assistance of transport proteins due to their charge or size. Transport across membranes also occurs within individual cells, playing a variety of essential roles for the plant as a whole.
17.8K
Levels of Organization01:09

Levels of Organization

Biological organization is the classification of biological structures, ranging from atoms at the bottom of the hierarchy to the Earth's biosphere. Each level of the hierarchy represents an increase in complexity that builds upon the previous level.
Molecules Are Composed of Atoms, and Biomolecules Are Assembled from Molecules:
The most basic levels include atoms, molecules, and biomolecules. Atoms, the smallest unit of ordinary matter, are composed of a nucleus and electrons. Molecules...
141.5K
Escape Velocity01:26

Escape Velocity

The escape velocity of an object is defined as the minimum initial velocity that it requires to escape the surface of another object to which it is gravitationally bound and never to return. For example, what would be the minimum velocity at which a satellite should be launched from the Earth's surface such that it just escapes the Earth's gravitational field?
To calculate the escape velocity, it is assumed that no energy is lost to any frictional forces. In practice, a satellite...
8.4K
Escape Velocities of Gases01:19

Escape Velocities of Gases

To escape the Earth's gravity, an object near the top of the atmosphere at an altitude of 100 km must travel away from Earth at 11.1 km/s. This speed is called the escape velocity. The temperature at which gas molecules attain the rms speed, which is equal to the escape velocity, can be estimated by using the equation for the average kinetic energy of the gas molecules. According to the kinetic theory of gas, the average kinetic energy of the gas molecules is proportional to its...
1.4K