Related Experiment Video
Updated: Feb 9, 2026

Construction of a Low-cost Mobile Incubator for Field and Laboratory Use
Published on: March 19, 2019
Data exploration on factors that influences construction cost and time performance on construction project sites
Lekan M Amusan1, Adedeji Afolabi1, Raphael Ojelabi1
1Department of Building Technology, Covenant University, Ota, Nigeria.
Abstract:
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project.
More Related Videos
07:37Measuring the Flight Ability of the Ambrosia Beetle, Platypus Quercivorus Murayama, Using a Low-Cost, Small, and Easily Constructed Flight Mill
Published on: August 6, 2018
05:56Construction of a Compact Low-Cost Radiation Shield for Air-Temperature Sensors in Ecological Field Studies
Published on: November 6, 2018
Related Concept Videos
Bode Plots Construction
Construction of Root Locus
For positive gain values, the root locus exists on the real axis to the left of an odd number of finite open-loop poles or zeros. The root locus starts at the open-loop poles and traces the paths of the closed-loop poles as the gain...
Construction of Frequency Distribution
First, make a table with two columns—one with the title of the data that needs to be organized, and the other column for frequency. [Draw a third column for tally marks if needed]. Then, take a look at the items given in the data set and decide if an ungrouped frequency distribution table or a grouped frequency distribution table would be more suitable. If there are large sets of different values, then it is...
Bioavailability: Influencing Factors
Factors Influencing Microbial Growth: pH
Factors Influencing Heart Rate
Let us explore the significant factors affecting heart rate, including age, body temperature, posture, acute pain, chemical influences,...