Related Experiment Video
Updated: Feb 5, 2026

A Protocol for Collecting and Constructing Soil Core Lysimeters
Published on: June 6, 2016
Treatment of Sewage Using a Constructed Soil Rapid Infiltration System Combined with Pre-Denitrification
Wenlai Xu1,2,3, Jinyao Chen4, Yue Jian5
1State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059, China. xuwenlai1983@163.com.
Abstract:
The activated sludge process of the anaerobic/oxic (A/O) process has a good denitrification performance because it can make full use of the carbon source in the original sewage, and the denitrification can provide alkalinity for aerobic nitrification. The traditional constructed soil rapid infiltration (CSRI) system, on the other hand, has a poor nitrogen removal effect. Dividing the traditional CSRI system into two sections, one performs denitrification as an anoxic section, while the other performs nitrification as an aerobic section and is placed after the anoxic section. The nitrification liquid of the effluent from the aerobic section is mixed with the original wastewater and enters the anoxic section for denitrification. We expected that this would be improved by combining CSRI with a pre-denitrification step that would make full use of the carbon source in the original sewage. In a small-scale experimental model, the removal efficiencies of nitrogen, in the form of ammonium, nitrate, and total nitrogen (TN), as well as chemical oxygen demand (COD), were determined. The hydraulic load was varied, while the backflow reflux capacity was kept constant, to determine the effect on the pre-denitrification process. An average removal rate of 95.4% for NH₄⁺-N and 96% for COD could be obtained when a hydraulic load of 80 cm³(cm²·d)-1 and a reflux ratio of 75% were applied. Under these conditions, the average removal rate of TN was 77.4%, which is much higher than what can be typically achieved with conventional CSRI systems.
Related Concept Videos
The Soil Ecosystem
pre-mRNA Processing
Once about 20-40 ribonucleotides have been joined together by RNA polymerase, a group of enzymes adds a “cap” to the 5’ end of the growing transcript. In this process, a 5’ phosphate is replaced by modified guanosine that has a methyl group attached to it (7-Methyl...
Pre-mRNA Processing: Modification of pre-mRNA Ends
Once about 20-40 ribonucleotides have been joined together by RNA polymerase, a group of enzymes adds a cap to the 5' end of the growing transcript. In this process, a 5' phosphate is replaced by modified guanosine that has a methyl group attached (7-methyl guanosine). This 5' cap helps...
Chromatin Structure Regulates pre-mRNA Processing
The chromatin structure, especially...
Construction of Root Locus
For positive gain values, the root locus exists on the real axis to the left of an odd number of finite open-loop poles or zeros. The root locus starts at the open-loop poles and traces the paths of the closed-loop poles as the gain...
Construction of Frequency Distribution
First, make a table with two columns—one with the title of the data that needs to be organized, and the other column for frequency. [Draw a third column for tally marks if needed]. Then, take a look at the items given in the data set and decide if an ungrouped frequency distribution table or a grouped frequency distribution table would be more suitable. If there are large sets of different values, then it is...

