Related Experiment Video
Updated: Feb 5, 2026

Construction of a Preclinical Multimodality Phantom Using Tissue-mimicking Materials for Quality Assurance in Tumor Size Measurement
Published on: July 29, 2013
Dataset for material logistics on construction sites.
Patience F Tunji-Olayeni1, Adedeji O Afolabi1, Emmanuel E Eshofonie2
1Covenant University, Ota, Nigeria.
This study examines construction logistics management in Abuja, Nigeria, identifying key factors influencing material procurement, delivery accuracy, and demand forecasting. It offers insights for improving site operations and supply chain efficiency in the Nigerian construction industry.
Area of Science:
- Construction Management
- Supply Chain Logistics
- Nigerian Construction Industry
Background:
- Effective logistics management is crucial for construction project success.
- Nigerian construction sites face unique challenges in material handling and delivery.
- Optimizing construction logistics can lead to significant cost and time savings.
Purpose of the Study:
- To investigate logistics management practices on construction sites in Abuja, Nigeria.
- To identify factors affecting material purchase and delivery accuracy.
- To explore challenges, benefits, and demand forecasting methods in construction logistics.
Main Methods:
- Data collection from 55 construction professionals (Architects, Builders, Civil Engineers, Project Managers, Quantity Surveyors).
- Analysis of responses concerning material purchase, delivery, challenges, benefits, and demand forecasting.
- Qualitative insights into construction logistics in the Nigerian context.
Main Results:
- Identified critical factors influencing material purchase and delivery accuracy.
- Documented common challenges and benefits associated with construction material delivery.
- Explored various methods for forecasting material demand on construction sites.
- Provided a comprehensive overview of current logistics management practices.
Conclusions:
- Logistics management significantly impacts construction project outcomes in Nigeria.
- Addressing identified challenges can enhance efficiency and reduce costs.
- The study serves as a valuable reference for future research and practice in construction logistics.
Related Concept Videos
Conserved Binding Sites
Binding sites are often located in large pockets, and if their location on a protein’s surface is unknown, it can be predicted using various approaches. The energetic method computationally...
Conserved Binding Sites
Ligand Binding Sites
Protein-ligand interactions are quite specific; even though numerous potential ligands surround a cellular protein at any given time, only a particular ligand can bind to that protein. Moreover, a ligand binds only to a dedicated area on the surface of the protein, known as the...
Ligand Binding Sites
Temperature Measurement Sites
Oral: When assessing oral temperature, the thermometer tip should be placed under the tongue in the posterior sublingual pocket. It offers accurate readings and can be...
Pulse Assessment Sites

