Related Experiment Video
Updated: Feb 4, 2026

Megakaryocyte Culture in 3D Methylcellulose-Based Hydrogel to Improve Cell Maturation and Study the Impact of Stiffness and Confinement
Published on: August 26, 2021
AlloHSCT in paediatric ALL and AML in complete remission: improvement over time impacted by accreditation?
Shahrzad Bakhtiar1, Emilia Salzmann-Manrique1, Martin Hutter1
1Division for Stem Cell Transplantation and Immunology, Department for Children and Adolescents, University Hospital, Goethe University, Frankfurt/Main, Germany.
Abstract:
Allogeneic hematopoietic stem cell transplantation (alloHSCT) has become a well-established treatment option for many patients suffering from malignant and non-malignant diseases. In the past decade, high-resolution HLA-typing, remission surveillance, pre-emptive immune intervention, and standardisation in supportive care measures have substantially improved transplant outcomes. This retrospective study evaluated transplant procedures in 162 paediatric patients with acute lymphoblastic leukaemia (n = 124) or acute myeloid leukaemia (n = 38) who received their first alloHSCT in our institution over an 11-year period. We observed a significant reduction in risk of non-relapse mortality (NRM) over time (HR = 0.34, 95% CI 0.12-0.98; P = 0.05), the 4-year NRM estimate decreased from 20% in 2005-2008 to 7% in 2012-2016 (P = 0.02) and an increase in survival after relapse. There was no significant difference in patients who received a graft from a sibling, haplo, or an unrelated donor with regard to their overall survival (P = 0.45), event-free survival (P = 0.61), and non-relapse mortality (P = 0.19). Our data suggest that a specific transplant infrastructure with a highly experienced team in an accredited transplant centre likely contributes to better transplant outcomes for acute leukaemia patients in complete remission regardless of donor type.
More Related Videos
11:30Fluorescence Time-lapse Imaging of the Complete S. venezuelae Life Cycle Using a Microfluidic Device
Published on: February 28, 2016
11:44Real-Time DC-dynamic Biasing Method for Switching Time Improvement in Severely Underdamped Fringing-field Electrostatic MEMS Actuators
Published on: August 15, 2014
Related Concept Videos
Impact of Groups on Groups
Impact
When particles with different initial velocities collide, they induce deformation by applying equal and opposite impulses. At the point of maximum deformation, the particles move together with...
Impact of Groups on Individuals
Impact of Individuals on a Group
Impact of Schemas
Types of Impact
The coefficient of restitution is a metric for understanding the dynamics of impacts. It quantifies the ratio of relative velocity...