Related Experiment Video
Updated: Feb 4, 2026

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
Published on: April 11, 2018
Sensitivity of the IQM transmission detector to errors of VMAT plans
Gary Razinskas1, Sonja Wegener1, Johannes Greber1
1Radiation Oncology, University of Wuerzburg, Josef-Schneider-Str. 11, 97080, Wuerzburg, Germany.
Purpose:
The integral quality monitor (IQM) transmission detector is a wedge-shaped large area ionization chamber that reports a position-weighted dose area product for each control point of an IMRT or VMAT plan. In this study, the accuracy of the signal prediction is verified for the Synergy Agility MLC. Tolerance criteria for VMAT plan verification with the IQM were obtained from the observed sensitivity for the detection of incorrectly delivered plans.
Methods:
The predicted IQM signal was compared to the measured signal recorded for a set of 30 VMAT plans for each beam quality of 6 and 10 MV. The system's capability to detect incorrectly delivered plans was tested by measuring altered plans containing small, random deviations. In addition, the observed deviations were related to measurements performed with a second QA phantom.
Results:
The cumulative IQM signal per arc deviated from the respective calculation on average by -0.48% (6 MV) and +0.21% (10 MV) with a standard deviation of 1.08% in both cases, suggesting a 2% warning and 3% action threshold as plan acceptance criteria. This choice was confirmed by the optimum threshold of 2.5% obtained via receiver operating characteristic (ROC) analysis. Reproducibility of individual control points in multiply measured plans was low (on average 7% for 1SD) and thus, segment-by-segment comparison was impractical. A suitable criterion to resolve the angular distribution of the plan was identified by binning three to five control points as a running average. While the correlation between IQM signal deviations and gamma passing rates obtained with the ArcCHECK phantom was low for clinical plans, it was apparent for erroneous plans. Binning led to even higher sensitivity to errors.
Conclusions:
The IQM was able to detect induced errors at least as reliable as the standard phantom and showed the potential to be used in pretreatment plan verification to ensure the correct plan transfer and delivery. However, there is no direct correlation between the IQM signal deviation and DVH metrics, so the IQM should be primarily used to screen for errors. Finer diagnostics should then be carried out using a different phantom.
Related Concept Videos
Systematic Error: Methodological and Sampling Errors
Sampling errors originate from improper sampling methods or the wrong sample population. These errors can be minimized by refining the sampling strategy. Defective instruments or faulty calibrations are the sources of instrumental...
Fundamental Attribution Error
Random Error
Margin of Error
Gas Chromatography: Types of Detectors-I
TCD is the earliest and most widely used detector that operates by measuring the changes in the thermal conductivity of the carrier gas. When a sample compound enters the detector,...
Sampling Plans
Random sampling is a method where each member of the population has an equal chance of being selected for the sample. It involves selecting individuals randomly, often using random number generators or lottery-type methods. For example, when analyzing the properties of a...

