Related Experiment Video
Updated: Feb 3, 2026

Author Spotlight: Streamlining Protein Target Prediction and Validation via Molecular Docking and CETSA
Published on: February 23, 2024
Validating Sclerotinia sclerotiorum Apothecial Models to Predict Sclerotinia Stem Rot in Soybean (Glycine max) Fields
Jaime F Willbur1, Mamadou L Fall2, Adam M Byrne3
1Department of Plant Pathology, University of Wisconsin-Madison.
Abstract:
In soybean, Sclerotinia sclerotiorum apothecia are the sources of primary inoculum (ascospores) critical for Sclerotinia stem rot (SSR) development. We recently developed logistic regression models to predict the presence of apothecia in irrigated and nonirrigated soybean fields. In 2017, small-plot trials were established to validate two weather-based models (one for irrigated fields and one for nonirrigated fields) to predict SSR development. Additionally, apothecial scouting and disease monitoring were conducted in 60 commercial fields in three states between 2016 and 2017 to evaluate model accuracy across the growing region. Site-specific air temperature, relative humidity, and wind speed data were obtained through the Integrated Pest Information Platform for Extension and Education (iPiPE) and Dark Sky weather networks. Across all locations, iPiPE-driven model predictions during the soybean flowering period (R1 to R4 growth stages) explained end-of-season disease observations with an accuracy of 81.8% using a probability action threshold of 35%. Dark Sky data, incorporating bias corrections for weather variables, explained end-of-season disease observations with 87.9% accuracy (in 2017 commercial locations in Wisconsin) using a 40% probability threshold. Overall, these validations indicate that these two weather-based apothecial models, using either weather data source, provide disease risk predictions that both reduce unnecessary chemical application and accurately advise applications at critical times.
Related Concept Videos
Reliability and Validity
Predicting Molecular Geometry
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Data Validation
Key parameters for method validation include:
Data Validation
Nursing assessment guides are generally based on holistic models rather than medical...
End Point Prediction: Gran Plot
For potentiometric titration, the Gran plot is created by plotting...

