Association between tear film break up time and blink interval in visual display terminal users

Miki Uchino1, Motoko Kawashima1, Yuichi Uchino1

  • 1Department of Ophthalmology, Keio University School of Medicine, Tokyo 160-8582, Japan.

Abstract

Related Concept Videos

Termination of Translation01:44

Termination of Translation

The large ribosomal subunit has several important structures essential to translation. These include the peptidyl transferase center (PTC) - which is the site where the peptide bond is formed - and a large, internal, water-filled tube through which the nascent polypeptide moves. This latter structure is called the Peptide Exit Tunnel, and it begins at the PTC and spans the body of the large ribosomal subunit. During translation, as the nascent polypeptide chain is synthesized, it passes through...
27.7K
Termination of Translation01:44

Termination of Translation

6.8K
Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
3.4K
Fixing Double-strand Breaks02:04

Fixing Double-strand Breaks

The double-stranded structure of DNA has two major advantages. First, it serves as a safe repository of genetic information where one strand serves as the back-up in case the other strand is damaged. Second, the double-helical structure can be wrapped around proteins called histones to form nucleosomes, which can then be tightly wound to form chromosomes. This way, DNA chains up to 2 inches long can be contained within microscopic structures in a cell. A double-stranded break not only damages...
14.7K
Confidence Intervals01:21

Confidence Intervals

An unbiased point estimate is often insufficient to predict a population estimate, such as population mean or population proportion. In this scenario, a confidence interval is used. A confidence interval is an estimate similar to a  sample proportion. However, unlike the point estimate which is a single value, the confidence interval  contains a range of values. These values have lower and upper limits, known as confidence limits, and can be designated as L1 and L2, respectively.
A...
10.7K
Improper Integrals: Infinite Intervals01:29

Improper Integrals: Infinite Intervals

An integral is classified as improper due to an infinite interval when at least one of its limits of integration extends to positive or negative infinity. In such cases, the region under the curve is unbounded, and standard techniques for evaluating definite integrals are not directly applicable. Instead, the improper integral is defined through a limiting process that allows one to determine whether the accumulated area remains finite despite the infinite domain.Application to Exponential...
99