Sampling system for estimating woody debris in an urban mixed tropical forest

Sylvio Péllico Netto1, Allan L Pelissari1, Andressa Bribeiro2

  • 1Departamento de Ciências Florestais, Universidade Federal do Paraná/UFPR, Avenida Prefeito Lothário Meissner, 632, Jardim Botânico, 80210-170 Curitiba, PR, Brazil.

Related Concept Videos

What are Estimates?01:06

What are Estimates?

It isn't easy to measure a parameter such as the mean height or the mean weight of a population. So, we draw samples from the population and calculate the mean height or mean weight of the individuals in the sample. This sample data acts as a representative measure of the population parameter. These sample statistics are known as estimates. 
The estimate for the mean of a sample is denoted by ͞x, whereas the mean of the population is designated as μ. Further, parameters such...
8.8K
Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
386
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
481
Estimation of k and VD of Aminoglycosides01:20

Estimation of k and VD of Aminoglycosides

Aminoglycosides are a class of antibiotics used to treat various bacterial infections. Clinicians must determine the elimination rate constant (k) and volume of distribution (VD) to optimize therapeutic efficacy and minimize toxicity. The k value represents the rate at which the drug is removed from the body, and the VD reflects the degree to which the drug distributes into body tissues. Accurately estimating these parameters allows healthcare professionals to tailor drug dosing to individual...
246
Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
369
Estimation of the Physical Quantities01:05

Estimation of the Physical Quantities

On many occasions, physicists, other scientists, and engineers need to make estimates of a particular quantity. These are sometimes referred to as guesstimates, order-of-magnitude approximations, back-of-the-envelope calculations, or Fermi calculations. The physicist Enrico Fermi was famous for his ability to estimate various kinds of data with surprising precision. Estimating does not mean guessing a number or a formula at random. Instead, estimation means using prior experience and sound...
7.7K