Impact evaluation of a Critical Pathway for patients with Clostridium difficile infection: A pre-post analysis in a

Antonio Giulio de Belvis1, Andrea Barbara2, Gabriele Giubbini2

  • 1Section of Hygiene, Institute of Public Health, Università Cattolica del Sacro Cuore, Roma, Italy; Fondazione Policlinico Universitario A. Gemelli IRCCS, Roma, Italy.

Abstract

Related Concept Videos

Critical Region, Critical Values and Significance Level01:16

Critical Region, Critical Values and Significance Level

The critical region, critical value, and significance level are interdependent concepts crucial in hypothesis testing.
In hypothesis testing, a sample statistic is converted to a test statistic using z, t, or chi-square distribution. A critical region is an area under the curve in  probability distributions demarcated by the critical value. When the test statistic falls in this region, it suggests that the null hypothesis must be rejected. As this region contains all those values of the...
13.4K
Patient-centered Care01:13

Patient-centered Care

Patient-centered care involves delivering care beyond inpatient hospitalization. Reflective practice can enhance a patient-centered approach. Reflective practice is a process of reasoning that considers all aspects of the present situation, including practicalities, learning from personal practice, and consideration of patient needs. Patients appreciate care decisions made while considering their input. Involving the patient in their care provides the patient with a sense of contribution rather...
3.0K
Cardiomyopathy VII: Pre and Post Operative Nursing Management01:28

Cardiomyopathy VII: Pre and Post Operative Nursing Management

Patients with hypertrophic cardiomyopathy (HCM) and left ventricular outflow tract (LVOT) obstruction who remain symptomatic despite optimal medical therapy may undergo a septal myectomy (Morrow procedure). This procedure involves excising a portion of the hypertrophied septum below the aortic valve using a heart-lung machine to improve blood flow through the LVOT. Effective preoperative and postoperative nursing management ensures successful patient outcomes, minimizes complications, and...
341
Lattice Centering and Coordination Number02:33

Lattice Centering and Coordination Number

The structure of a crystalline solid, whether a metal or not, is best described by considering its simplest repeating unit, which is referred to as its unit cell. The unit cell consists of lattice points that represent the locations of atoms or ions. The entire structure then consists of this unit cell repeating in three dimensions. The three different types of unit cells present in the cubic lattice are illustrated in Figure 1.
Types of Unit Cells
Imagine taking a large number of identical...
11.5K
Critical Values01:31

Critical Values

A critical value is a definite value obtained from a particular probability distribution at a predecided confidence level (or a predecided significance level) for a given population parameter. The critical value provides demarcation that separates the sample statistics that are likely to occur from the ones that are unlikely to occur based on the given probability distribution and the population parameter to be estimated. The critical value for normal distribution is obtained from the z...
10.3K
Center of Gravity00:58

Center of Gravity

The center of gravity (COG) of an object is the point where the object's total weight is considered to be concentrated. Knowing the location of the center of gravity is useful when predicting the behavior of a moving object or designing static structures. In a uniform gravitational field, the center of gravity is similar to the center of mass (COM); yet, these two points can be positioned differently. For example, the Moon's center of mass lies very close to its geometric center, but...
6.7K