Retinotopic and topographic analyses with gaze restriction for steady-state visual evoked potentials

Nannan Zhang1, Yadong Liu1, Erwei Yin2,3

  • 1College of Mechatronic Engineering and Automation, National University of Defense Technology, Changsha, Hunan, 410073, P. R. China.

Scientific Reports
|March 16, 2019
PubMed
Summary

Researchers developed an electroencephalography (EEG) eye tracking system to optimize steady-state visual evoked potentials (SSVEPs). This system precisely controls gaze, revealing optimal stimulus arrangements for enhanced SSVEP responses in brain-computer interface designs.

Related Concept Videos

Steady State Concentration01:05

Steady State Concentration

A steady state refers to the level of a drug in the body once it has reached an equilibrium between administration and elimination. It represents the point at which the drug administration rate equals the drug elimination rate, resulting in a relatively constant concentration in the body over time. The dynamic equilibrium is crucial to ensure the drug's effectiveness with minimal risk of toxicity.
Most drugs are administered in repeated doses at fixed intervals or through continuous...
5.9K
Steady Flow of a Fluid Stream01:27

Steady Flow of a Fluid Stream

Consider a control volume, such as a pipe with solid boundaries, through which fluid flows and changes direction due to the impulse exerted by the resulting force from the pipe walls. In steady flow, the mass of fluid entering the control volume at a given time, t, with velocity v1, is equal to the mass leaving after infinitesimal time dt, with velocity v2.
During this process, the momentum of the fluid within the control volume remains constant over the time interval dt. By applying the...
742
Topographic Surveying and Contours01:29

Topographic Surveying and Contours

Topographic surveying is critical for documenting the Earth's surface, focusing on capturing elevations, slopes, and natural and man-made features. It is essential in construction planning, water resource management, and land-use analysis. The primary outcome of such surveys is a topographic map, which uses contour lines to visually represent the shape and slope of the terrain, providing valuable insights into the landscape's characteristics.Contour lines are fundamental to understanding the...
900
Plotting of Topographic Maps01:29

Plotting of Topographic Maps

Topographic maps represent the Earth's surface features using contour lines, which connect points of equal elevation to create a two-dimensional representation of three-dimensional terrain. Creating a topographic map requires a systematic approach.Begin by plotting a scaled grid and marking intersections corresponding to the survey's elevation data points. Assign elevation values at these intersections to build the base map. Next, determine contour levels using a consistent contour interval,...
505
Transient and Steady-state Response01:24

Transient and Steady-state Response

In control systems, test signals are essential for evaluating performance under various conditions. The ramp function is effective for systems undergoing gradual changes, while the step function is suitable for assessing systems facing sudden disturbances. For systems subjected to shock inputs, the impulse function is the most appropriate test signal.
These test signals are integral in designing control systems to exhibit two key performance aspects: transient response and steady-state...
555
Velocity and Acceleration in Steady and Unsteady Flow01:11

Velocity and Acceleration in Steady and Unsteady Flow

In fluid mechanics, velocity and acceleration are key concepts for analyzing particle motion in both steady and unsteady flow. Consider a fluid particle moving along a pathline, where its velocity depends on its position and time. The particle's acceleration is obtained by differentiating the velocity with respect to time.
The acceleration can be generalized to any point in the flow, and expressed as components along three perpendicular directions, representing changes in velocity over...
405