Mixed adenoneuroendocrine carcinoma of the urethra

Nicholas Raison1,2, Ursula McGovern3, John Hines4

  • 1Department of Urology, Royal Free London NHS Foundation Trust, London, UK.

BMJ Case Reports
|March 24, 2019
PubMed

Related Concept Videos

Urethra01:16

Urethra

The urethra is a hollowed tubular organ through which urine is expelled from the body. This structure extends from the bladder to the external opening, allowing urine to be released.
The anatomy of the urethra differs between males and females. In females, the urethra is short, measuring about 3–4 cm in length, and opens anterior to the vaginal opening. In males, the urethra is longer and passes through the penis, serving dual purposes: expelling urine and ejaculating semen. The male...
4.2K
Anatomy of the Genitourinary System II: Bladder and Urethra01:19

Anatomy of the Genitourinary System II: Bladder and Urethra

The lower urinary system consists of the urinary bladder and urethra, which are essential in storing and expelling urine from the body. Together with the internal and external sphincters, these structures work together to regulate urination effectively.Anatomy of the BladderThe urinary bladder is a muscular, stretchable organ behind the pubic bone and in front of the rectum. In females, the bladder is positioned anterior to the vagina and inferior to the uterus, while in males, it is located...
1.5K
Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
374
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
478
Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
356
Design Example: Vintage Mixing Console01:17

Design Example: Vintage Mixing Console

A sound engineer at a music company recently encountered a problem. The output from their newly acquired studio's vintage mixing console was too low for the requirements of modern recording equipment. To rectify this situation, the engineer decided to design an audio pre-amplifier using an operational amplifier (op-amp) to boost the signal level.
The specifications for the pre-amplifier were clear. It needed to amplify the audio signal by a factor of 10, have an input impedance above 10...
563