Related Experiment Video
Updated: Jan 27, 2026

Using CRISPR/Cas9 to Knock Out GM-CSF in CAR-T Cells
Published on: July 22, 2019
[Cooperation between Clinics and Hospitals Using a Critical Path for G-CSF Prophylaxis in Cancer Chemotherapy]
Tsutomu Takahashi1, Fumimasa Takahashi, Yusuke Okada
1Dept. of Oncology/Hematology, Shimane University Hospital.
Background:
Prophylactic granulocyte-colony stimulating factor(G-CSF)is necessary for some cancer patients receiving anti-cancer drugs. However, it is difficult for cancer patients in rural areas to receive G-CSF as outpatients because of inconvenient official transport, lack of public support, and low activity levels due to age. To resolve this problem, we began conducting a critical path(G-path)with regional medical institutions from 2011.
Methods:
We retrospectively surveyed the clinical records of cancer patients receiving prophylactic G-CSF using G-path at our hospital.
Results:
Eighty-two patients who were administered a total of 254 cycles of chemotherapy were examined between January 2011 and December 2016. Diseases included malignant lymphoma(n=64), pancreatic cancer(n=7), soft tissue sarcoma(n=5), and others(n=6). The median age of the patients was 70(range: 24-94)years. Fifty-three patients visited medical offices, and 31 patients visited regional hospitals. In 245 of 254(96%)cycles, planned G-CSF administration was performed. In 37 of 254(15%)cycles, infectious episodes developed, but patients needed hospitalization for only 5 cycles(2%).
Conclusion:
Cooperation between clinics and hospitals using G-path reduced ambulatory burden and prevented severe infection. Cooperation in supportive care may allow for equal accessibility to cancer treatment.
Related Concept Videos
Cooperative Allosteric Transitions
Hospitals-II
Nurses that work in...
Cooperative Binding of Transcription Regulators
Hospitals-I
Cancer-Critical Genes I: Proto-oncogenes
When the function of certain critical genes, especially those involved in cell cycle regulation and cell growth signaling cascades, gets disrupted, it upsets the cell cycle progression. Such cells with unchecked cell cycles start proliferating uncontrollably and eventually develop into tumors.
Such genes that act...
Mean free path and Mean free time

