Effective long-term control of Echinococcus multilocularis in a mixed rural-urban area in southern Germany

Andreas König1, Thomas Romig2, Ernst Holzhofer3

  • 1Technical University of Munich, School of Life Science Weihenstephan, Wildlife Biology and Management, Freising, Germany.

Plos One
|April 13, 2019
PubMed

Related Concept Videos

Southern Blot02:57

Southern Blot

Agarose gel electrophoresis is very useful in separating DNA fragments by size. Running a DNA ladder containing fragments of the known length alongside the sample helps determine the approximate length of the sample DNA fragments. However, additional steps are needed to verify the sequence identity of the sample DNA fragments.
Denatured DNA fragments must be transferred onto a carrier membrane from the gel to make it accessible to a probe - a small ssDNA fragment complementary to the target DNA...
22.7K
Long-term Depression01:05

Long-term Depression

Long-term depression, or LTD, is one of the ways by which synaptic plasticity—changes in the strength of chemical synapses—can occur in the brain. LTD is the process of synaptic weakening that occurs over time between pre and postsynaptic neuronal connections. The synaptic weakening of LTD works in opposition to synaptic strengthening by long-term potentiation (LTP) and together are the main mechanisms that underlie learning and memory.
33.2K
Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
373
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
477
Framing Effects03:26

Framing Effects

Information is everywhere and its presentation—such as how and when items are presented—can impact our perceptions and decisions surrounding the info. This broad concept umbrellas framing effects—influences that occur due to the way information is framed in its appearance, whether it’s purely the order or the specific wording of a message. Let’s take a look at numerous ways in which two versions of something can objectively say the same thing, yet we respond in...
7.9K
Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
356