Identification of critical pathways and hub genes in TP53 mutation prostate cancer by bioinformatics analysis

Jian Sun1, Ke Zhang1, Zheng Cai1

  • 1Department of Urology, The Affiliated Suzhou Hospital of Nanjing Medical University, Suzhou, Jiangsu, 215000, PR China.

Related Concept Videos

Cancer-Critical Genes II: Tumor Suppressor Genes01:05

Cancer-Critical Genes II: Tumor Suppressor Genes

Genes usually encode proteins necessary for the proper functioning of a healthy cell. Mutations can often cause changes to the gene expression pattern, thereby altering the phenotype.
When the function of certain critical genes, especially those involved in cell cycle regulation and cell growth signaling cascades, gets disrupted, it upsets the cell cycle progression. Such cells with unchecked cell cycles start proliferating uncontrollably and eventually develop into tumors.
Such genes that act...
9.4K
Cancer-Critical Genes I: Proto-oncogenes01:33

Cancer-Critical Genes I: Proto-oncogenes

Genes usually encode proteins necessary for the proper functioning of a healthy cell. Mutations can often cause changes to the gene expression pattern, thereby altering the phenotype.
When the function of certain critical genes, especially those involved in cell cycle regulation and cell growth signaling cascades, gets disrupted, it upsets the cell cycle progression. Such cells with unchecked cell cycles start proliferating uncontrollably and eventually develop into tumors.
Such genes that act...
11.2K
Mutation, Gene Flow, and Genetic Drift01:09

Mutation, Gene Flow, and Genetic Drift

In a population that is not at Hardy-Weinberg equilibrium, the frequency of alleles changes over time. Therefore, any deviations from the five conditions of Hardy-Weinberg equilibrium can alter the genetic variation of a given population. Conditions that change the genetic variability of a population include mutations, natural selection, non-random mating, gene flow, and genetic drift (small population size).
63.4K
Mutations01:39

Mutations

Overview
94.4K
Cancers Originate from Somatic Mutations in a Single Cell02:21

Cancers Originate from Somatic Mutations in a Single Cell

Cancer arises from mutations in the critical genes that allow healthy cells to escape cell cycle regulation and acquire the ability to proliferate indefinitely. Though originating from a single mutation event in one of the originator cells, cancer progresses when the mutant cell lines continue to gain more and more mutations, and finally, become malignant. For example, chronic myelogenous leukemia (CML) develops initially as a non-lethal increase in white blood cells, which progressively...
14.7K
Viral Mutations00:36

Viral Mutations

A mutation is a change in the sequence of bases of DNA or RNA in a genome. Some mutations occur during replication of the genome due to errors made by the polymerase enzymes that replicate DNA or RNA. Unlike DNA polymerase, RNA polymerase is prone to errors because it is not capable of “proofreading” its work. Viruses with RNA-based genomes, like HIV, therefore accrue mutations faster than viruses with DNA-based genomes. Because mutation and recombination provide the raw material...
39.8K