Xpert negative means no TB: A mixed-methods study into early implementation of Xpert in Puducherry, India

Ariarathinam Newtonraj1, Emilie Venables2, Kalaiselvi Selvaraj3

  • 1Department of Community Medicine, Pondicherry Institute of Medical Sciences, Puducherry, India.

Abstract

Related Concept Videos

Nursing Implementation01:15

Nursing Implementation

Implementation is the execution of the nursing care plan developed during the planning phase.
The five steps to implementing effective nursing care include reassessing the patient, reviewing and revising the existing nursing care plan, organizing the resources and care delivery, anticipating and preventing complications, and implementing nursing interventions.
6.0K
Negative Regulator Molecules01:23

Negative Regulator Molecules

Positive regulators allow a cell to advance through cell cycle checkpoints. Negative regulators have an equally important role as they terminate a cell’s progression through the cell cycle—or pause it—until the cell meets specific criteria.
38.3K
Positive, Negative, and Zero Work00:58

Positive, Negative, and Zero Work

Work is done on an object when energy is transferred to the object. In other words, work is done when a force acts on a body that undergoes a displacement from one position to another. By definition, the work done by a force is the integral of the force with respect to the displacement along its path. Forces can vary as a function of position, and displacements can occur along various paths between two points. The magnitude of a force multiplied by the cosine of the angle that the force makes...
22.1K
Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
373
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
475
Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
354