Post-stroke rehabilitation: Factors predicting discharge to acute versus subacute rehabilitation facilities
Neal Rakesh1,2,3, Daniel Boiarsky1, Ammar Athar1
1Department of Rehabilitation and Regenerative Medicine, Columbia University College of Physicians and Surgeons.
Abstract:
The aim of this study was to examine predictors of discharge of hospitalized stroke patients to either an acute inpatient rehabilitation facility (IRF) or subacute skilled nursing facility (SNF).A retrospective cohort study was done in a large multicampus urban academic medical center of individuals hospitalized for stroke between January 1, 2015 and December 31, 2015 and who were discharged to either an IRF (n = 84) or SNF (n = 59). A set of characteristics and scales were collected on each patient and assessed using univariate and multivariate regression analyses.Although univariate analyses revealed multiple measures were associated with discharge destination, the most predictive multivariate logistic regression model for discharge to SNF incorporated age (odds ratio [OR] = 1.09, 95% confidence interval [CI], 1.05-1.13), premorbid physical disability (OR 7.52, 95% CI 1.66-34.14), and inability to ambulate before discharge (OR 5.84, 95% CI 2.01-16.92) with an overall c-statistic of 0.85.Increasing age, premorbid physical disability, and inability to ambulate increase the overall likelihood of discharge to a SNF. These findings need to be replicated in larger samples to determine whether they are generalizable.
More Related Videos
07:35Author Spotlight: Rehabilitation of Stroke Patients With a Digital Occupational Training System
Published on: December 29, 2023
11:06A Human-machine-interface Integrating Low-cost Sensors with a Neuromuscular Electrical Stimulation System for Post-stroke Balance Rehabilitation
Published on: April 12, 2016
Related Concept Videos
Discharge Summary Forms
Here's a detailed look at the key components and guidelines for preparing a discharge summary:
RC Circuits: Discharging A Capacitor
Predicting Molecular Geometry
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Transcription Factors
End Point Prediction: Gran Plot
For potentiometric titration, the Gran plot is created by plotting...
