A commissioning rod assembly for the Jamaican SLOWPOKE-2 nuclear reactor
C Koclas1, A Muftuoglu1, A Teyssedou1
1Department of Engineering Physics, Polytechnique Montreal, 2900 Blvd., Édouard-Montpetit, Campus de l'Université de Montréal, Montréal, Québec H3T 1J4, Canada.
Abstract:
Within the framework of the Material Management and Minimization Conversion Program of the U.S. Department of Energy's National Nuclear Security Administration, the Argonne National Laboratory approved the manufacturing of a Jamaica's SLOWPOKE-2 nuclear reactor (JM-1) mock-up, reactor removal tools, and commissioning rods by Polytechnique Montreal. This mock-up reactor was then used to practice dry runs of the JM-1 high enriched uranium core removal activities and fresh low enriched uranium core loading operations of the JM-1 reactor conversion. One of the most crucial elements in the commissioning of a new reactor core is the commissioning rod assembly. Hence, this paper presents the design, the fabrication, the calibration, and the dry runs performed at Polytechnique Montreal with commissioning rod assembly. The work was then resumed at Jamaica's International Centre for Environmental and Nuclear Sciences.
Related Concept Videos
Nuclear Power
Nuclear Fuels
Nuclear fuel consists of a fissile isotope, such as uranium-235, which must be present in sufficient quantity to provide a...
Nuclear Fusion
A helium nucleus has a mass that is 0.7% less than that of four hydrogen nuclei; this lost mass is converted into energy during the fusion. This reaction produces about...
Nuclear Transmutation
Nuclear Stability
To hold positively charged protons together...
Non-nuclear Inheritance
Radioactivity and Nuclear Equations
A nuclide of an element has a specific number of protons and...