Wood Transcriptome Profiling Identifies Critical Pathway Genes of Secondary Wall Biosynthesis and Novel Regulators

Min-Ha Kim1, Jin-Seong Cho2, Hyung-Woo Jeon3,4

  • 1Department of Plant & Environmental New Resources, Kyung Hee University, Yongin 446-701, Korea. minha123@khu.ac.kr.

Genes
|September 11, 2019
PubMed

Related Concept Videos

The Use of Induced Somatic Sector Analysis (ISSA) for Studying Genes and Promoters Involved in Wood Formation and Secondary Stem Development09:54

The Use of Induced Somatic Sector Analysis (ISSA) for Studying Genes and Promoters Involved in Wood Formation and Secondary Stem Development

Here we present a protocol that facilitates the medium to high throughput functional characterization of gene and promoter constructs in tree secondary stem tissue within comparatively short time frames. It is efficient, easy to use and widely applicable to a range of tree...
9.2K
siRNA Screening to Identify Ubiquitin and Ubiquitin-like System Regulators of Biological Pathways in Cultured Mammalian Cells10:43

siRNA Screening to Identify Ubiquitin and Ubiquitin-like System Regulators of Biological Pathways in Cultured Mammalian Cells

Here, we describe a methodology to perform a targeted siRNA “ubiquitome” screen to identify novel ubiquitin and ubiquitin-like regulators of the HIF1A-mediated cellular response to hypoxia.  This can be adapted to any biological pathway where a robust read out of reporter activity is...
11.8K
Primary and Secondary Growth in Roots and Shoots03:02

Primary and Secondary Growth in Roots and Shoots

Vascular plants, which account for over 90% of the Earth’s vegetation, all undergo primary growth—which lengthens roots and shoots. Many land plants, notably woody plants, also undergo secondary growth—which thickens roots and shoots.
60.1K
Glycan Profiling of Plant Cell Wall Polymers using Microarrays12:30

Glycan Profiling of Plant Cell Wall Polymers using Microarrays

A technique called Comprehensive Microarray Polymer Profiling (CoMPP) for the characterisation of plant cell wall glycans is described. This method combines the specificity of monoclonal antibodies directed to defined glycan-epitopes with a miniature microarray analytical platform allowing screening of glycan occurrence in a broad range of biological...
15.1K
MEDUSA for Identifying Death Regulatory Genes in Chemo-genetic Profiling Data07:17

MEDUSA for Identifying Death Regulatory Genes in Chemo-genetic Profiling Data

This protocol describes how to use the MEDUSA analytical method to quantify the death regulatory effect of each gene knockout. It includes instructions on determining experimental conditions that optimize sensitivity and a step-by-step tutorial on performing the...
871
Integrate Imaging Flow Cytometry and Transcriptomic Profiling to Evaluate Altered Endocytic CD1d Trafficking09:01

Integrate Imaging Flow Cytometry and Transcriptomic Profiling to Evaluate Altered Endocytic CD1d Trafficking

Imaging flow cytometry provides an ideal approach to detect the morphological and functional alteration of cells at individual and populational levels. Disrupted endocytic function for lipid antigen presentation in pollutant-exposed human dendritic cells was demonstrated with a combined transcriptomic profiling of gene expression and morphological demonstration of protein...
7.1K