Evaluation of pile driving accidents in geotechnical engineering

Tuğba Eskişar1, Özge Akboğa Kale2

  • 1Department of Civil Engineering, Ege University, Turkey.

Related Concept Videos

Impact Strength of Concrete01:21

Impact Strength of Concrete

Impact strength in concrete is a critical measure that reflects the material's capability to endure the forces applied during pile driving and when supporting machinery foundations that experience impulsive loads. It is also essential when handling precast concrete components to prevent accidental damage. The impact strength is assessed by observing the concrete's resistance to repeated impacts and energy absorption capacity. A key indicator of significant damage to concrete is when it...
543
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
497
Microcracking in Concrete01:20

Microcracking in Concrete

Microcracking in concrete refers to the tiny cracks that can form within the material even before any external load is applied. These microcracks typically occur at the interface between the coarse aggregate and the hydrated cement paste, often as a result of differential volume changes prompted by variations in stress-strain behavior, as well as thermal and moisture movement. Initially, these microcracks remain stable and do not grow substantially until the concrete is stressed to about 30...
396
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
362
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
331
Errors in Taping01:18

Errors in Taping

Errors in taping arise from multiple factors that can significantly impact measurement accuracy in surveying. Misalignment of the tape, often due to human error, is one primary source. A skilled rear tapeman, using a telescope, can help correct alignment by guiding the head tapeman; however, human limitations still lead to small inaccuracies. These errors may include misplacement of pins or inaccurate tape readings due to common visual confusions, such as mistaking a six for a nine. Such...
278