Determination of the Mechanical Properties of Flexible Connectors for Use in Insulated Concrete Wall Panels
Published on: October 19, 2022
Response of Connections between Concrete Corbels and Safety Barriers
Sara Cattaneo1,2, Pietro Crespi1
1Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Piazza Leonardo da Vinci 32, 20133 Milano, Italy.
Abstract:
Post-installed anchor systems are widely used in several applications both for retrofit and new constructions due to their flexibility and easiness of installation. For these reasons, their use is very common to connect safety barriers to concrete corbels. However, the design requirements for fastening (Eurocode 2-Part 4, ACI 318 or for post-installed rebar (Eurocode 2-Part 1 can be hardly satisfied due to the geometric restrictions of the application. Additional complications arise for the refurbishment of bridge corbels, which usually requires the removal of the damaged top concrete layer. This paper presents a new anchoring system that consists of the use of additional post-installed U-shaped rebars connecting the lower existing portion of the corbel to the upper (rebuilt) layer, able to carry the required design loads. The proposed solution considers three anchors that transfer the external loads to the corbel, to the existing reinforcements, and to the U-shaped rebars. The system is tested experimentally and validated by using both theoretical (strut and tie modeling) and numerical analyses.
More Related Videos
Related Concept Videos
Spanning Openings in Brick Walls
Lintels are primary supports used to span openings and can be crafted from materials such as reinforced concrete, steel-reinforced brick masonry, or simple steel angles. These are straightforward to install and are typically concealed...
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Composite Masonry Walls
Design Example: Distributing Reinforcements in Concrete Sections
Masonry Loadbearing Walls