Related Experiment Video
Updated: Dec 30, 2025

Author Spotlight: Improving Radiation Therapy Access with Radiation Planning Assistant
Published on: October 6, 2023
Impact of Radiologist-Driven Change-Order Requests on Outpatient CT and MRI Examinations
Sarvenaz Pourjabbar1, Joseph J Cavallo1, Jennifer Arango1
1Department of Radiology and Biomedical Imaging, Yale-New Haven Hospital, Yale School of Medicine, New Haven, Connecticut.
Purpose:
To assess impact of electronic medical record-embedded radiologist-driven change-order request on outpatient CT and MRI examinations.
Methods:
Outpatient CT and MRI requests where an order change was requested by the protocoling radiologist in our tertiary care center, from April 11, 2017, to January 3, 2018, were analyzed. Percentage and categorization of requested order change, provider acceptance of requested change, patient and provider demographics, estimated radiation exposure reduction, and cost were analyzed. P < .05 was used for statistical significance.
Results:
In 79,310 outpatient studies in which radiologists determined protocol, change-order requests were higher for MRI (5.2%, 1,283 of 24,553) compared with CT (2.9%, 1,585 of 54,757; P < .001). Provider approval of requested change was equivalent for CT (82%, 1,299 of 1,585) and MRI (82%, 1,052 of 1,283). Change requests driven by improper contrast media utilization were most common and different between CT (76%, 992 of 1,299) and MRI (65%, 688 of 1,052; P < .001). Changing without and with intravenous contrast orders to with contrast only was most common for CT (39%, 505 of 1,299) and with and without intravenous contrast to without contrast only was most common for MRI (26%, 274 of 1,052; P < .001). Of approved changes in CT, 51% (661 of 1,299) resulted in lower radiation exposure. Approved changes frequently resulted in less costly examinations (CT 67% [799 of 1,198], MRI 48% [411 of 863]).
Conclusion:
Outpatient CT and MRI orders are deemed incorrect in 2.9% to 5% of cases. Radiologist-driven change-order request for CT and MRI are well accepted by ordering providers and decrease radiation exposure associated with imaging.
More Related Videos
05:37Cone Beam Intraoperative Computed Tomography-based Image Guidance for Minimally Invasive Transforaminal Interbody Fusion
Published on: August 6, 2019
06:59Improved Registration of 3D CT Angiography with X-ray Fluoroscopy for Image Fusion During Transcatheter Aortic Valve Implantation
Published on: June 3, 2018
Related Concept Videos
Radiological Investigation I: X-ray and CT
Imaging Studies I: CT and MRI
Description of the Procedures
Computed Tomography (CT) scan:
Computed Tomography (CT) scans use X-ray technology to generate detailed images of bones, organs, and tissues. During the scan, the patient lies on a moving table...
Imaging Studies III: Computed Tomography
Imaging Studies for Cardiovascular System V: CT
Imaging Studies for Cardiovascular System IV: CMRI
Computed Tomography
The technique was invented in the 1970s and is based on the principle that as X-rays pass through the body, they are absorbed or reflected at different levels. In the technique, a patient lies on a motorized platform while a computerized axial tomography (CAT) scanner rotates...