Abstract:
A well-designed collection system plays a critical role in establishing a financially sustainable construction and demolition (C&D) management system. In order to achieve the best performance of the collection system, the development of an advanced decision-making tool with trade-off among multiple criteria is significant. The main objective of this research is to select economically best locations of transfer stations (TSs) to improve the effectiveness and efficiency of the collection system for C&D waste. This paper develops a scenario-based multi-period robust facility location model to minimize the total cost of the collection system for C&D waste. The novelty of the proposed model is the consideration of the uncertainty of C&D waste generation source locations in the construction industry. Also, besides the traditional economic criteria, the risk of decision-making or the reliability of the optimal solution obtained is taken into account for the best overall performance solution. A comparative analysis is performed to demonstrate the superiority of the proposed model. The trade-offs between decision-making risk and economic criteria are performed with a sensitivity analysis. By applying the proposed robust facility location model for TSs for a case study in Chongqing, China, this paper verify the effectiveness and usefulness of the model. The results of this study indicate that the dynamic location strategy made by the proposed robust model can remain the optimal layout of the TSs under uncertainty to improve facility efficiency. Moreover, focusing on risk criteria in decision-making can achieve the best performance solution with reliability.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Preplaced Aggregate Concrete
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...